Answer:
Step-by-step explanation:
The mean, [tex]\bar{x}[/tex], is 90 and the standard deviation, [tex]\sigma[/tex], is 12. We are looking for the probability that the variable X will fall between 57 and 105. We use the z-score table for this, AFTER we find the z scores. The formula to find the z-scores for us is:
[tex]P(\frac{57-\bar{x}}{\sigma}\leq z\leq \frac{105-\bar{x}}{\sigma})[/tex] and we fill in accordingly:
[tex]P(\frac{57-90}{12}\leq z\leq \frac{105-90}{12})[/tex] which simplifies to
[tex]P(-2.75\leq z\leq 1.25)[/tex] and we will break them up into 2 different sets as follows:
P(-2.75 ≤ z ≤ 0) + P(0 ≤ z ≤ 1.25)
and based on the fact that z scores are given from 0 on up, we are going to convert the first one by using the logic that if z is greater than -2.75 but less than 0, by symmetry, z is greater than 0 but less than 2.75:
P(0 ≤ z ≤ 2.75) + P(0 ≤ z ≤ 1.25) and we go to the z-score table.
Locate 2.7 down along the left side and move over til you're under the .05; that gives us the z-score for 2.75 which is .4970. Do the same for 1.25 to get a z-score of .3944. Add them together to get a final z-score that covers the range of values for X:
.4970 + .3944 = 0.8914
In the paper airplane shown, ABCD = EFGH, M
Answer:
it should be 90 I could be wrong
A P E X fasted answer is getting 30 points please hurry.
suppose a normal distribution has a mean of 98 and a standard deviation of 6. what is p(x ≥ 92)
Answer:
Step-by-step explanation:
If the mean is 98 and standard deviation is 6, then 92 is one standard deviation to the left of the mean; that means that 34% + 34% + 13.5% + 2.35% + .15% of the data is included in this area. Add those up and you get, as a percentage, 84%.
Answer:
0.84
Step-by-step explanation:
yee its right
binomial expansions for clever cookies
The answers are in the red rectangles with the work.
Let me know if something is unreadable.
A contractor construct to build a house in 30 days. He employed 10 men to build the house. After 20 days. They completed only 1 /3 of the total work. How many more men will be required to finish the remaining work within due time?
Answer:
30
Step-by-step explanation:
First, we can say that because the men do 1/3 of the work in 20 days,
for 10 men:
20 days = 1/3 total work
Because we need the house built in 30 days, and 20 days have already passed, we only have 30-20=10 days left. Furthermore, 20/2=10, so in our equation of 20 days = 1/3 total work, we can divide both sides by 2 to get
10 days = 1/6 total work
The amount of work we need to get done in 10 days is (all of it) - (1/3 of total work) = 1 - 1/3 = 2/3 = 4/6
Since 10 men can do 1/6 of the work in 10 days, 10*4 =40 men can do 1/6 * 4 = 4/6 of the work in 10 days. This is the amount of work that needs to get done. Therefore, the contractor needs 40 (total workers) - 10 (current workers) = 30 new workers to finish the remaining work in due time
s the function represented by the table non-linear?
x
y
6
4
7
2
8
0
9
–2
PLS HELP MEE
1st equation: a^2 + b^2 = c^2
2nd equation: a^2 + b^2 = n^2
Since the equations for both triangles have a^2 + b^2, you can think of the two equations for c^2 and n^2 as a system of equations. Substitute what a^2 + b^2 equals in the first equation for a^2 + b^2 in the second equation. After you substitute, what equation do
you get?
Answer:
c² = n²
Step-by-step explanation:
Given the 2 equations
a² + b² = c² → (1)
a² + b² = n² → (2)
Substitute a² + b² = c² into (2)
c² = n²
please help me please i will give brainliest
Answer:
I think It would be A
Step-by-step explanation:
Answer:
i think its A
Step-by-step explanation:
(if its not im sorry :( )
Divide 384.085 by 50.5 using the correct number of significant digits. O A) 7.65 OB) 7.6517 O C) 7.652 OD 7.61
Answer:
d) 7.61
Step-by-step explanation:
384.085 ÷ 50.5 = 7.605643
d is the only possible value (u get it when u round up to 3 sf)
Answer:
D) 7.61Step-by-step explanation:
384.085 d i v i d e d b y 50.5
= 7.61
A kiddie pool holds 161 gallons of water. One hose can fill the pool in 3 hours while an-
other takes only 2 hours. How long will it take for the pool to be filled if both hoses are
used?
The first hose pumps out water at a rate of
(161 gal)/(3 h) = 161/3 gal/h
The second hose fills the pool at a rate of
(161 gal)/(2 h) = 161/2 gal/h
Working together, they can fill the pool at a rate of
(161/3 + 161/2) gal/h = 805/6 gal/h
so that it would take
(161 gal) / (805/6 gal/h) = 161×6/805 h = 6/5 h = 1.2 h = 1 h 12 min
to fill the pool.
in parallelogram ABCD the measure of m
A) 82.5
B) 97.5
C) 120
D) 130
The measure of the angle C is 120°.
Given that the parallelogram ABCD, we need to find the measure of the angle C,
We know that in a parallelogram the opposite angles are equal and the adjacent angles are supplementary,
So,
∠D = ∠B
6x + 6 = 10x - 30
4x = 36
x = 9
So, ∠D = ∠B = 60°
So,
∠C + ∠D = 180°
∠C = 180° - 60°
∠C = 120°
Hence the measure of the angle C is 120°.
Learn more about parallelogram click;
https://brainly.com/question/28854514
#SPJ1
form a polynomial whose factors are (x+1) , (x+2) and (x-3)
Answer:
x³-7x-6
Step-by-step explanation:
Find the products of the factors
(x+1)(x+2)(x-3)
x²+3x+2(x-3)
x³+3x²+2x-3x²-9x-6
x³-7x-6
i need help plsssssssss
Answer:
are you look for finaincl loan
Step-by-step explanation:
Round 2.577681 to four decimal places
Answer:
2.5777
Step-by-step explanation:
The 6 in "2.577681" is greater than 5, so the value increases by 1.
1. A department store kept records of how many fans were sold each day and the high temperature for that day. The results are shown in the scatterplot. Answer the questions about the scatterplot.
a. What is the explanatory variable (independent variable)? (1 point)
b. What is the response variable (dependent variable)? (1 point)
c. Circle the best range for the correlation coefficient. (1 point)
(–1 to –0.7) (–0.7 to –0.3) (–0.3 to 0) (0 to 0.3) (0.3 to 0.7) (0.7 to 1.0)
d. Based on this scatterplot, does a rise in temperature cause more fans to be sold? Why or why not? (3 points)
Answer:
a. What is the explanatory variable (independent variable)? (1 point)
Number of fans sold.
b. What is the response variable (dependent variable)? (1 point)
Outside temperature.
c. Circle the best range for the correlation coefficient. (1 point)
(–1 to –0.7) (–0.7 to –0.3) (–0.3 to 0) (0 to 0.3) (0.3 to 0.7) (0.7 to 1.0)
d. Based on this scatterplot, does a rise in temperature cause more fans to be sold? Why or why not? (3 points)
Yes because a rise in temperature causes fan sales to go up because people buy fans when it’s hot to cool off.
Step-by-step explanation:
I got it right on AP3X. Hope this helps!
using appropriate properties , find 7/5 × 5/12 − 3/12 × 7/5 − 1/15
Answer:
[tex] \frac{1}{6} [/tex]
Step-by-step explanation:
[tex] \frac{7}{5} \times \frac{5}{12} - \frac{3}{12} \times \frac{7}{5} - \frac{1}{15} = \frac{7}{5} ( \frac{5}{12} - \frac{3}{12} ) - \frac{1}{15} = \frac{7}{5} \times \frac{1}{6} - \frac{1}{15} = \frac{7}{30} - \frac{2}{30} = \frac{5}{30} = \frac{1}{6} [/tex]
How many five-digit odd numbers can be formed from the digits 1, 2, 3, 4,and 5 if no digit is repeated?
Answer:
10
Step-by-step explanation:
the answer is 10 because there are only two odd numbers in here and the best. Even so when you put that in two digit odd number then it'll just be interchangeable those four numbers that aren't at the end of
Answer:
72
Step-by-step explanation:
For a five-digit number to be odd it's one digit must be 1,3,5.
So there can be no repeats of any digits.
Let's look at numbers with one's digit being 1.
There are 4 ways to choose the tabs digit.
After that you can choose the hundreds digit 3 ways.
The thousands digit can then be chosen 2 ways.
Then finally the ten-thousands digit can be chosen 1 way.
4×3×2×1=24
24 odd numbers with one's digit being 1 that are 5 digits long only using 1,2,3,4, and 5 with no repeats.
That means there are 24 odd numbers with one's digit being 3 that are 5 digits long only using 1,2,3,4, and 5 with no repeats.
Also means there are 24 odd numbers with one's digit being 5 that are 5 digits long only using 1,2,3,4, and 5 with no repeats.
3(24)=72
Independent Practice
Which model is most appropriate for the set of points?
(–2, 5), (–1, –1), (0, –3), (1, –1), (2, 5)
A.
exponential
B.
linear
C.
quadratic
Ferris started to bike the 4 1/3 miles to school. After 3/5 mile, he stoppedto talk to a friend. How mush farther did he have to go to get to school?
Answer:
3 11/15 miles
Step-by-step explanation:
4 1/3 - 3/5
4 5/15 - 9/15
3 20/15 - 9/15
3 11/15 miles
the area of a trapezoid is 21 inches, one of its bases is 8 inches and its height is 3 inches. What is the length of the last base?
Answer:
6 inches
Step-by-step explanation:
A=b1+b2/2*h
Fill in the equation with what we know
21=8+x/2*3
Isolate x
Quick steps: 21/3=7*2=14-8=6
x=6
hlpppppp plesaseeeeeeeeeeeeeeeee
Answer:
50
Step-by-step explanation:
Given,
96 + 2² / 2
96 + 4 / 2
100 / 2
50
Please hurry I will mark you brainliest
Answer:
D y=2/3 x +1
y= -3/2 x+2
Step-by-step explanation:
Perpendicular lines have slopes that multiply to -1
The equations are written in slope intercept form
y = mx+b where m is the slope
A 1/5* 5 = 1 not perpendicular
B 2/3 * 3/2 = 1 not perpendicular
C -1/5 * -5 = 1 not perpendicular
D 2/3 * - 3/2 = -1 perpendicular
I need help for this question 3 so can anyone help me please
carly walks 30 feet in seven seconds. At this rate, how many minutes will it take for carly to walk a mile if there are 5,280 feet in one mile?
Answer:
20.53 minutes
Step-by-step explanation:
Speed = Distance/Time = 30/7
Time = Distance / Speed
= 5280/30/7
= 1232 seconds / 60 = 20.53 minutes
Answered by Gauthmath
Tìm x,y biết x+y=12
2x=3y
Answer:
x= -12 & y=24
Step-by-step explanation:
given,
x+y=12.......... equation (i)
2x=3y........eq(ii)
let,
x=12-y.......eq(iii)
from eq(ii)
2(12-y)=3y
y=24
putting the value of y in eq(iii)
x=12-24
x= -12
Find the place value of 3 in 3546.
Answer:
that is the thousands place value.
the place value of 3 in 3546.= 3000
Someone explain this I don’t understand
George is painting fences at the zoo. It takes 2 2/3 cans of paint to paint each fence. If George paints 9 fences, how much paint will he use?
Answer: 24 cans
Step-by-step explanation:
Given
George has 9 fence
It requires [tex]2\frac{2}{3}[/tex] cans to paint a fence
So, 9 fence required
[tex]\Rightarrow 9\times 2\dfrac{2}{3}\\\\\Rightarrow 9\times \dfrac{8}{3}\\\\\Rightarrow 3\times 8=24\ \text{cans}[/tex]
9 fence requires 24 cans
** I NEED TO GET THIS RIGHT IM DOING TEST CORRECTION**
point p Is the circumcenter of ABC. point p is the point of concurrency of the perpendicular bisector. Find AS.
Answer: ~27.5
Step-by-step explanation:
I don't know about all the geometry terms, but since a line is 180°, and SE makes 1 right angle (90°), the other side is also 90° (180-90=90).
This means you have a right triangle with sides 15 and 23 and unknown hypotenuse AS.
Pythagorean Theorem: a^2 + b^2 = c^2
(15^2) + (23^2) = AS^2
sqrt( 225 + 529 ) = AS
AS = 27.459
A 10-foot ladder rests against a vertical wall. Let x be the distance from the bottom of the ladder to the wall and y be the distance from the floor to the top of the ladder. If the bottom of the ladder slides away from the wall, how fast does the top of the ladder fall down the wall with respect to x
Answer:
The rate of change of the top of the ladder with respect to x is -x/y
Step-by-step explanation:
The given parameters are;
The length of the ladder = 10 ft.
The horizontal distance of the bottom of the ladder from the wall = x
The distance of the top of the ladder from the floor = y
By Pythagoras's theorem, we have;
10 = y² + x²
Therefore, we have;
x² = 10 - y²
d(x²)/dx = 2·x = d(10 - y²)/dx = -2·y·dy/dx
∴ 2·x = -2·y·dy/dx
dy/dx = 2·x/(-2·y) = -x/y
Therefore, the rate of change of the top of the ladder with respect to x, dy/dx = -x/y.
Can someone please help me
Answer:
- 3Step-by-step explanation:
As,
- 0.0084
When estimated,
= - 0.008
[tex] = \frac{ - 8}{1000} [/tex]
Then,
[tex] - 8 \times \frac{1}{1000} [/tex]
[tex] = - 8 \times {10}^{ - 3} [/tex]
Here,
Power of ten as observed is -3