an example of an external irreversibility associated with the rankine cycle is group of answer choices expansion of the working fluid through the turbine. frictional effects resulting in pressure drops. combustion of fuel. d. irreversibilities in the pump.

Answers

Answer 1

The Rankine cycle is a thermodynamic cycle that is widely used in power generation systems. It is a cycle that operates on a working fluid, which is typically water or steam. The cycle consists of four main components: a pump, a boiler, a turbine, and a condenser.

The working fluid undergoes a series of processes within these components to produce power. However, like any thermodynamic cycle, the Rankine cycle is subject to irreversibilities, both internal and external, which result in losses and reduced efficiency.An external irreversibility associated with the Rankine cycle is the expansion of the working fluid through the turbine. When the working fluid expands through the turbine, it does so against the blades of the turbine, which causes frictional effects. These frictional effects result in pressure drops, which are irreversible losses in the system. The energy that is lost due to these pressure drops cannot be recovered, which results in reduced efficiency of the cycle. This external irreversibility is a significant source of loss in the Rankine cycle.Other external irreversibilities associated with the Rankine cycle include those in the pump. The pump is responsible for pressurizing the working fluid, which is necessary for the cycle to operate. However, the pump is subject to frictional losses as well, which results in irreversibilities. These losses are due to the resistance that the working fluid encounters as it passes through the pump, and they result in a reduction in the overall efficiency of the cycle.

To know more about Rankine visit:

brainly.com/question/15128974

#SPJ11


Related Questions

Feedback is a continuous improvement process where the output of the process is fed back into the input to be improved.

Answers

Feedback is an essential part of any improvement process, as it allows for the evaluation of the output and the identification of areas that need improvement. In this context, feedback is a continuous process that involves the cyclical exchange of information between the output and the input.

The basic idea behind feedback is to use the output of a process to improve the input. This can be done by analyzing the output and identifying areas that need improvement. Once these areas are identified, they can be used to modify the input, which will result in an improved output. The process of feedback is continuous because it involves an ongoing cycle of evaluation and improvement. As the input is modified, the output is evaluated, and any further areas for improvement are identified. This cycle continues until the desired level of performance is achieved.

In conclusion, feedback is a critical process for continuous improvement. By using the output of a process to modify the input, it is possible to achieve a higher level of performance and efficiency. The process of feedback is ongoing, and it requires a commitment to evaluation and improvement to be successful. Ultimately, feedback is an essential tool for any organization or individual that seeks to improve their performance and achieve their goals.

To learn more about Feedback, visit:

https://brainly.com/question/30449064

#SPJ11

a battery that causes serious bodily injury or is committed with a deadly weapon is called

Answers

A battery that causes serious bodily injury or is committed with a deadly weapon is called aggravated battery.

Battery is a legal term used to describe the intentional use of force against another person, without their consent, resulting in harmful or offensive contact. Aggravated battery is a more serious offense than simple battery, and it usually involves the use of a deadly weapon or the infliction of serious bodily injury.

The specific definition of aggravated battery varies by jurisdiction, but it generally involves the use of a weapon or the infliction of serious harm to the victim. In some jurisdictions, the use of any weapon in the commission of a battery can elevate the charge to aggravated battery, while in others, the weapon must be a deadly weapon.

A deadly weapon is typically defined as any object or instrument that is capable of causing death or serious bodily injury. This can include firearms, knives, or other sharp or blunt objects that can be used to inflict serious harm. In some cases, the use of a non-deadly weapon, such as a baseball bat or a hammer, can also be considered aggravated battery if the harm inflicted is particularly severe.

The penalties for aggravated battery can be severe and may include lengthy prison sentences, fines, and other legal consequences. The specific penalties will depend on the jurisdiction and the circumstances of the offense.

To learn more about battery, click here: brainly.com/question/31362524

#SPJ11

.Packet fragmentation is not normal, and can only occur if an attack has been initiated.
T RUE or FALSE?

Answers

The statement is false. It is not true that packet fragmentation can only occur if an attack has been initiated.

Packet fragmentation is a normal and common process in computer networking, which occurs when a packet of data is too large to be transmitted over a network in a single unit. In such cases, the packet is broken down into smaller fragments that can be transmitted individually and reassembled at the receiving end. This process is handled by the IP layer of the networking stack, which includes protocols such as IPv4 and IPv6.

Packet fragmentation can occur for a variety of reasons, such as the presence of network congestion or the use of different maximum transmission unit (MTU) sizes across different parts of the network. In fact, packet fragmentation is an important feature of IP networking, which enables data to be transmitted efficiently and reliably across diverse networks with varying characteristics.

Packet fragmentation can also occur as a result of a malicious attack, known as a fragmentation attack, which aims to exploit vulnerabilities in the IP layer by sending intentionally fragmented packets. However, this is just one example of a malicious use of packet fragmentation, and does not imply that packet fragmentation is only associated with attacks.

In summary, packet fragmentation is a normal and necessary process in computer networking that enables efficient and reliable data transmission. While it can be exploited for malicious purposes, it is not true that packet fragmentation can only occur if an attack has been initiated.

To learn more about packet fragmentation, click here: brainly.in/question/56367245

#SPJ11

a projection is the path of the x-ray beam. if the projection is front to back it would be:

Answers

An anteroposterior projection (AP) passes from the front (anterior) of the person and exits through the back (posterior) of the person. This means the IR is located behind the person's back. In the posteroanterior projection (PA), the x-ray beam enters the back of the person and exits the front of the person.

injector cleaning is being discussed. technician a uses a wire brush to clean the tips of the injectors. technician b soaks the injector in cleaning solvent. who is correct?

Answers

both Technician A and Technician B can be correct depending on the situation. The key is to choose the method that is most effective in cleaning the injector and restoring its performance.

Both methods can be effective, but they have their pros and cons. Using a wire brush to clean the tips of the injectors is a quick and easy way to remove any buildup or debris that may be blocking the injector. However, this method may not be effective in removing stubborn deposits that have accumulated over time.On the other hand, soaking the injector in cleaning solvent can help dissolve any buildup or deposits that may be blocking the injector. This method is more thorough and can help restore the injector's performance to its original condition. However, it may take longer and require more equipment and resources.Ultimately, the effectiveness of each method depends on the severity of the blockage and the type of contaminants that are present. Technicians should assess the condition of the injector and choose the appropriate method based on their professional judgment and experience.
To know more about Technician visit:

brainly.com/question/16048910

#SPJ11

Hey can anyone pls solve this problem step by step thank you!! 100 POINTS!!!!

Answers

The pressure on each leg of the table is approximately 132,352.94 pascals.

How to calculate the pressure

The area of each leg is given as 4.25 cm², so the area in square meters is:

4.25 cm² * 0.0001 m²/cm² = 0.000425 m²

Pressure = Total weight / Total area

The total weight of the table is given as 225 N, and since there are four legs, the total area is:

Total area = Area of each leg * Number of legs = 0.000425 m² * 4 = 0.0017 m²

Now, we can calculate the pressure:

Pressure = 225 N / 0.0017 m² ≈ 132,352.94 Pa

Learn more about pressure on

https://brainly.com/question/28012687

#SPJ1

the mass flow rate, specific heat, and inlet temperature of the tube-side stream in a double-pipe, parallel-flow heat exchanger are 2700 kg/h, 2.0 kj/kg.k, and 120c, respectively. the mass flow rate, specific heat and inlet temperature of the other stream are 1800 kg/h, 4.0 kj/kg.k, and 20c, respectively. the heat transfer area and overall heat transfer coefficient are 0.5 m2 and 2.0 kw/m2 .k, respectively. find the outlet temperature of both streams in steady operation using

Answers

The outlet temperature of both streams in steady operation of a double-pipe, parallel-flow heat exchanger will be the same as their inlet temperature, which is 120C for the tube-side stream and 20C for the other stream. This is because the logarithmic mean temperature difference is zero, indicating no temperature change during heat transfer.

To find the outlet temperature of both streams in a double-pipe, parallel-flow heat exchanger, we need to use the formula Q=U*A*ΔTlm, where Q is the heat transfer rate, U is the overall heat transfer coefficient, A is the heat transfer area, and ΔTlm is the logarithmic mean temperature difference.
First, we can calculate the logarithmic mean temperature difference using the formula ΔTlm= (ΔT1-ΔT2)/ln(ΔT1/ΔT2), where ΔT1 and ΔT2 are the temperature differences of the hot and cold streams, respectively.

ΔT1= 120-20=100C
ΔT2= 120-20=100C

ΔTlm= (100-100)/ln(100/100)= 0

Since ΔTlm=0, we can conclude that the outlet temperature of both streams will be the same as their inlet temperature. Therefore, the outlet temperature of the tube-side stream will be 120C, and the outlet temperature of the other stream will be 20C.

To know more about temperature visit:

brainly.com/question/7510619

#SPJ11

.A derived class may become a base class if another class is derived from it.
True or false?

Answers

True. A derived class may become a base class if another class is derived from it.

In object-oriented programming, a derived class is a class that inherits properties and methods from a base class. A derived class can also be used as a base class for another derived class. This means that a derived class may become a base class if another class is derived from it.

For example, suppose we have a base class called "Animal" and two derived classes called "Cat" and "Dog." If we create a new derived class called "Pet" that inherits from "Cat," then "Pet" becomes a new base class for any classes that derive from it.

This feature of object-oriented programming allows for the creation of complex class hierarchies that can be easily extended and modified as necessary. It also allows for code reuse and reduces the amount of redundant code that needs to be written. Overall, the ability for a derived class to become a base class is a powerful feature of object-oriented programming that enables the creation of flexible and scalable software systems.

Learn about scalable software here: brainly.com/question/32141018

#SPJ11

When the Product Owner realizes that the Sprint doesn't make sense anymore or because the Sprint Goal has become obsolete.

Answers

when the Product Owner realizes that the Sprint doesn't make sense anymore or the Sprint Goal has become obsolete, it's crucial to communicate this to the team and Scrum Master immediately and work together to find a solution. Cancelling a Sprint is a significant decision

Firstly, it's essential to understand what a Sprint is and what the Sprint Goal represents. In Scrum methodology, a Sprint is a time-boxed period of work where a team delivers a potentially releasable increment of the product. The Sprint Goal is an objective set for the team to focus on during the Sprint, which aligns with the overall vision and objectives of the product.Now, coming to your question, if the Product Owner realizes that the Sprint doesn't make sense anymore or that the Sprint Goal has become obsolete, the first thing they need to do is to inform the team and the Scrum Master. This situation is not uncommon, and the Product Owner needs to work with the team to understand why the Sprint Goal has become obsolete or why it doesn't make sense anymore.The reasons for this situation could be many. For example, the team may have discovered a new priority that needs to be addressed immediately, and it is more important than the Sprint Goal. Or, the stakeholders may have changed their mind, and the objectives of the product have shifted. Whatever the reason may be, it's crucial to address it immediately and make a decision on what to do next.

To know more about Scrum visit:

brainly.com/question/14582692

#SPJ11

Create a Frog instance in Program.Main() and assign it to a variable named mike.

Answers

In a programming context, creating a Frog instance and assigning it to a variable named "mike" in the Program.Main() method requires the use of a class called Frog.

First, define the Frog class with the necessary attributes and methods. Next, go to the Program.Main() method in your application, where the execution begins. Inside the Main() method, create a new instance of the Frog class using the "new" keyword followed by the class name, Frog. After that, assign the newly created Frog instance to a variable named "mike" using the assignment operator (=). This variable will store the Frog object and allow you to access its attributes and methods. In conclusion, you've successfully created a Frog instance in the Program.Main() method and assigned it to a variable named mike, which can now be used throughout the program.

To know more about variable visit:

brainly.com/question/15078630

#SPJ11

Match the communication type listed with the correct description following. a. Request for information b. Daily reports c. Field transmittal memos d. Monthly reports e. Notice to proceed 1 ___ Records the subcontractors working on site and key deliveries made. 2 ___ Reports the project's status to both the project team and the owner organization. 3 ___ A formal method of communication/clarification. 4 ___ Documents the official start of the project. 5 ___ Used to track submittals.

Answers

The correct matching of the given communication types is given below:

a. Request for information: 3 ___ A formal method of communication/clarification.

b. Daily reports: 1 ___ Records the subcontractors working on site and key deliveries made.

c. Field transmittal memos: 5 ___ Used to track submittals.

d. Monthly reports: 2 ___ Reports the project's status to both the project team and the owner organization.

e. Notice to proceed: 4 ___ Documents the official start of the project.

The Communication Types

a. Request for information: A formal method of communication/clarification. It is used when there is a need for additional information or clarification on a particular aspect of the project.

b. Daily reports: Records the subcontractors working on site and key deliveries made. These reports are typically prepared on a daily basis and provide a summary of the work performed, materials used, and any issues encountered during the day.

c. Field transmittal memos: Used to track submittals. These memos document the transmission of project-related information or documents between different parties involved in the project, such as the contractor, subcontractors, and consultants.

d. Monthly reports: Reports the project's status to both the project team and the owner organization. These reports provide a comprehensive overview of the project's progress, including financial information, milestones achieved, and any significant issues or risks.

e. Notice to proceed: Documents the official start of the project. It is a formal notification issued by the owner organization to the contractor, authorizing them to commence the work outlined in the contract.

Read more about communication here;
https://brainly.com/question/26152499
#SPJ1

______________________ by helping them understand and select trade-offs, but the people who will perform the work make the final estimate.

Answers

The process of estimating project costs involves a series of steps that require input from various stakeholders, including project managers, subject matter experts, and other team members. The goal of estimating project costs is to determine the resources required to complete the project within a certain timeframe and budget.

One of the critical aspects of estimating project costs is to help stakeholders understand and select trade-offs. This involves weighing the costs and benefits of different approaches to the project and determining the optimal balance between them. For example, stakeholders may need to decide whether to spend more money upfront to ensure higher quality or to save money by using less expensive resources that may be lower quality. While project managers and other stakeholders provide input into the cost estimation process, the people who will perform the work make the final estimate. These individuals are typically the most knowledgeable about the specific tasks involved in the project and the resources required to complete them. They may be able to provide more accurate estimates based on their experience and expertise, which can help ensure that the project is completed within the allocated budget and timeframe. In summary, estimating project costs involves a collaborative effort between various stakeholders, including project managers, subject matter experts, and team members. The process requires careful consideration of trade-offs and involves input from those who will perform the work to ensure the accuracy of the estimate.

To know more about project visit:

brainly.com/question/31920147

#SPJ11

Two forces each ION act on a on a body jone towards the north and the other towards the east. The magnitude and direction of the resultant forces are ​

Answers

To find the magnitude and direction of the resultant force, we can use vector addition.

First, we need to draw a diagram of the two forces. Let's call the force pointing north "F_N" and the force pointing east "F_E".

We can then use the Pythagorean theorem to find the magnitude of the resultant force:

|F_R| = sqrt(F_N^2 + F_E^2)

To find the direction of the resultant force, we can use trigonometry.

tan(theta) = F_E / F_N

where theta is the angle between the resultant force and the force pointing north.

We can then use inverse tangent to solve for theta:

theta = tan^-1(F_E / F_N)

Overall, the magnitude and direction of the resultant force will depend on the magnitudes of the two forces and the angle between them. Without numerical values for F_N and F_E, we cannot calculate the specific magnitude and direction of the resultant force.

( I wasn’t too sure on this one, but if it’s not what you were looking for, then please let me know so I can help again! )

In order to achieve 1000Base-T over CAT5e cable, 2 pairs of copper are needed.
True
False

Answers

The statement "In order to achieve 1000Base-T over CAT5e cable, 2 pairs of copper are needed" is False.

1000Base-T is a type of Ethernet network that operates at speeds of up to 1 gigabit per second (Gbps) over copper cables. CAT5e is a type of twisted pair cable that is commonly used for Ethernet networks. To achieve 1000Base-T over CAT5e, all four pairs of copper wires in the cable are used. Each pair carries data in both directions, and all four pairs are used simultaneously to achieve the desired data rate of 1 Gbps.

Therefore, the statement "In order to achieve 1000Base-T over CAT5e cable, 2 pairs of copper are needed" is false. Using only two pairs of copper would not provide enough bandwidth to support 1000Base-T speeds. However, it is worth noting that using only two pairs of copper may still be sufficient for lower speed Ethernet networks, such as 10Base-T or 100Base-TX.

Learn more about copper here: brainly.com/question/32139916

#SPJ11

What aspect of empirical process control theory involves frequently examining the different Scrum artifacts and making sure the team is still on track to meet the current goal?

Answers

One of the key aspects of empirical process control theory in the context of Scrum is the practice of continuous inspection and adaptation. This means that the Scrum team needs to frequently examine the different Scrum artifacts to make sure that the team is still on track to meet the current goal.

This is a critical component of the Scrum framework as it enables the team to identify and respond to any changes in the project environment, requirements, or stakeholder needs in a timely and effective manner.The Scrum artifacts that are typically examined as part of this process include the Product Backlog, Sprint Backlog, and the Increment. The Product Backlog is a prioritized list of all the features and requirements that need to be developed over the course of the project. The Sprint Backlog is a list of all the items that the team plans to work on during the current Sprint, while the Increment is the sum total of all the completed work at the end of each Sprint.To ensure that the team is still on track to meet the current goal, the Scrum team needs to inspect these artifacts frequently. This involves reviewing the progress made towards the Sprint goal, identifying any obstacles or impediments that may be preventing the team from achieving the goal, and adapting the plan as necessary to address these issues.For instance, during the Daily Scrum, which is a daily meeting held by the Scrum team, team members discuss their progress towards the Sprint goal and identify any impediments that may be preventing them from achieving the goal. This allows the team to adapt their plan for the day and make any necessary adjustments to their work.

To know more about Scrum visit:

brainly.com/question/14582692

#SPJ11

The purpose of the Daily Scrum questions _____________________________, so they can help identify problems with the current plan that need to be fixed.

Answers

The Daily Scrum questions serve a critical purpose in Agile methodology. These questions are designed to facilitate communication among team members and to help identify problems with the current plan that need to be fixed.

The Daily Scrum is a time-boxed event that occurs every day during a Sprint in which the team meets for a maximum of 15 minutes. During this time, the team members answer three questions: What did you do yesterday? What will you do today? Are there any obstacles in your way?The purpose of these questions is to provide a regular check-in and to ensure that everyone is on the same page regarding the progress of the project. By answering these questions, team members can share updates on their work, identify any potential issues or roadblocks, and discuss solutions to overcome them. This communication helps to ensure that everyone is working towards the same goal and that the project is progressing as planned.Furthermore, by discussing any obstacles that may be impeding progress, the team can work together to find solutions and implement necessary changes to the plan. This promotes continuous improvement and allows the team to adapt to changing circumstances, which is crucial in Agile methodology.

To know more about Scrum visit:

brainly.com/question/14582692

#SPJ11

the source for mechanical motion supplied to a generator is referred to as the ? .

Answers

The source for mechanical motion supplied to a generator is referred to as the prime mover.

A generator is a device that converts mechanical energy into electrical energy. The mechanical energy is typically supplied by a prime mover, which is any device that can supply the necessary rotational force to turn the generator's rotor. The prime mover can be powered by various sources of energy, such as fossil fuels, nuclear energy, hydroelectric power, wind power, or solar power.

The type of prime mover used depends on the specific application and available resources. For example, in a traditional power plant, the prime mover is typically a steam turbine that is powered by burning fossil fuels or nuclear reactions. In a hydroelectric power plant, the prime mover is the water that drives the turbine. In a wind turbine, the prime mover is the kinetic energy of the wind that turns the rotor blades.

Regardless of the type of prime mover used, the goal is to provide the necessary mechanical motion to turn the generator's rotor. The rotor is surrounded by a stator, which contains a series of electromagnets that produce a magnetic field. As the rotor turns, it generates an electrical current in the stator coils through the process of electromagnetic induction. This current is then transmitted through power lines to homes, businesses, and other electrical loads.

In summary, the prime mover is the source of mechanical motion that is supplied to a generator to produce electrical energy. The type of prime mover used depends on the specific application and available resources.

To learn more about mechanical energy, click here: brainly.com/question/19381962

#SPJ11

After the Sprint Planning, the items pulled from ___________ can't be changed.

Answers

After the Sprint Planning, the items pulled from the Product Backlog can't be changed. This is because Sprint Planning is the time when the Development Team decides what work they can commit to completing in the upcoming Sprint.

During the Sprint Planning meeting, the Development Team works with the Product Owner to select the Product Backlog items that will be worked on during the Sprint.Once the Development Team has committed to working on specific Product Backlog items, they are locked in for the duration of the Sprint. This is because the Sprint is a time-boxed iteration, meaning that it has a fixed start and end date. The purpose of this time-boxed iteration is to provide a predictable cadence for the team to deliver working software incrementally.If the Development Team were allowed to change the items pulled from the Product Backlog during the Sprint, it would make it difficult to predict what work will be completed within the time-boxed iteration. This could lead to delays, missed deadlines, and an inability to deliver working software incrementally.Therefore, it is important that the items pulled from the Product Backlog are not changed during the Sprint. However, if the team discovers new information or unforeseen circumstances arise that require a change in direction, they can work with the Product Owner to add new items to the Sprint Backlog. These new items would need to be carefully considered and prioritized to ensure that they do not disrupt the team's ability to deliver the previously committed work.

To know more about Sprint visit:

brainly.com/question/14582692

#SPJ11

a large residential area has 1400 households withan average household income of $40,000, an averagehousehold size of 4.8, and, on average, 1.5 workingmembers. using the model described in example 8.2(assuming it was estimated using zonal averagesinstead of individual households), predict the changein the number of peak-hour social/recreational tripsif employment in the area increases by 25% andhousehold income by 10%.

Answers

To predict the change in the number of peak-hour social/recreational trips, we need to use the following formula from Example 8.2:

delta_trips = delta_emp * B_emp + delta_hhinc * B_hhinc

where:
- delta_emp is the percentage change in employment
- B_emp is the regression coefficient for employment
- delta_hhinc is the percentage change in household income
- B_hhinc is the regression coefficient for household income

We are given that the model was estimated using zonal averages, so we can assume that the regression coefficients are the same for all households in the area.

From the problem statement, we know that the average household income is $40,000, the average household size is 4.8, and on average, 1.5 members of each household are working. Therefore, the total number of workers in the area is:

1400 households * 4.8 persons per household * 1.5 workers per household
= 10,080 workers

If employment increases by 25%, the new number of workers will be:

10,080 * 1.25 = 12,600 workers

If household income increases by 10%, the new average household income will be:

$40,000 * 1.1 = $44,000

Now we need the regression coefficients for employment and household income, denoted by B_emp and B_hhinc, respectively. These coefficients would have been estimated as part of the model development process, so we do not have enough information to calculate them without additional context.

Assuming we have the necessary coefficients, we can plug in the values for delta_emp, delta_hhinc, B_emp, and B_hhinc into the formula to calculate delta_trips. The resulting value would give us an estimate of the change in the number of peak-hour social/recreational trips.

Without the regression coefficients, it is not possible to provide a specific estimate for the change in the number of peak-hour social/recreational trips.

The predicted change in the number of peak-hour social/recreational trips is approximately 0.92 trips.

How does employment and household income affect peak-hour trips?

we need to consider the effects of changes in employment and household income to predict the change in the number of peak-hour social/recreational trips using the model described in example 8.2,

Let's break down the problem and calculate the steps one by one:

Calculate the current number of peak-hour social/recreational trips:

Average household income: $40,000

Average household size: 4.8

Average number of working members: 1.5

According to the model, the number of peak-hour social/recreational trips can be estimated using the formula:

Number of trips = (Income per capita / 1000) + (0.2 * Working members per household) + 0.1

Income per capita = Average household income / Average household size

Income per capita = $40,000 / 4.8 = $8,333.33 (approx.)

Number of trips = ($8,333.33 / 1000) + (0.2 * 1.5) + 0.1

Number of trips = 8.33 + 0.3 + 0.1

Number of trips = 8.73 (approx.)

So, the current number of peak-hour social/recreational trips is approximately 8.73.

2.Calculate the predicted change in the number of peak-hour social/recreational trips:

Employment increase: 25%

Household income increase: 10%

We will calculate the changes in income per capita and working members per household using the given increases:

New income per capita = Income per capita + (Income per capita * Household income increase)

New income per capita = $8,333.33 + ($8,333.33 * 0.10)

New income per capita = $8,333.33 + $833.33

New income per capita = $9,166.66 (approx.)

New working members per household = Average number of working members + (Average number of working members * Employment increase)

New working members per household = 1.5 + (1.5 * 0.25)

New working members per household = 1.5 + 0.375

New working members per household = 1.875 (approx.)

Now, we can calculate the predicted number of trips using the same formula as before:

New number of trips = (New income per capita / 1000) + (0.2 * New working members per household) + 0.1

New number of trips = ($9,166.66 / 1000) + (0.2 * 1.875) + 0.1

New number of trips = 9.17 + 0.375 + 0.1

New number of trips = 9.645 (approx.)

Therefore, the predicted change in the number of peak-hour social/recreational trips is approximately 9.645 - 8.73 = 0.915 (approx.), or approximately 0.92 trips.

Learn more about household income

brainly.com/question/31105746

#SPJ11

which of the following cctv camera types lets you adjust the distance that the camera can see

Answers

There are several types of CCTV cameras available in the market, but not all of them provide the option to adjust the distance that the camera can see. However, one type of CCTV camera that lets you adjust the distance is the varifocal camera.

A varifocal camera is a type of CCTV camera that comes with an adjustable lens, allowing the user to adjust the focal length manually. This feature provides the user with the flexibility to zoom in or out to get a closer or wider view of the area under surveillance.By adjusting the focal length, you can change the field of view of the camera, which affects the distance that the camera can see. For instance, if you need to monitor a small area like a doorway or a window, you can adjust the focal length to zoom in and get a more detailed view of the area. On the other hand, if you need to monitor a larger area like a parking lot, you can adjust the focal length to zoom out and get a wider view of the area.
In conclusion, if you need to adjust the distance that your CCTV camera can see, you should consider purchasing a varifocal camera as it provides you with the flexibility to zoom in or out and adjust the focal length manually.The type of CCTV camera that allows you to adjust the distance the camera can see is a varifocal camera. Varifocal cameras have adjustable lenses, which enable you to change the focal length and zoom in or out to achieve the desired field of view. This feature provides flexibility in monitoring different areas and adjusting the camera's focus as needed.

To know more about CCTV visit:

brainly.com/question/28902030

#SPJ11

Question 2 Water is supplied to a town with a population of 100000 at a rate of 200 L/person/day from a river, 4.5 km away. The difference in elevation between the lowest water level in the sump and service reservoir is 25 m. Given that the pumps work 6 hours a day and the maximum demand to be 1.5 times the average annual demand, allowable velocity is 1.0-1.5m/s and the pipe sizes available are 650 mm, 750 mm, 900 mm and 1200 mm, determine: (i) The size of the trunk mains and the corresponding velocity (ii) The head loss between the source and the reservoir (iii) The Brake Horse Power of the pump (efficiency -65%) [15 marks] [7 marks] [3 marks]​

Answers

The size of the trunk mains is 900 mm and the corresponding velocity is 1.39 m/s.

The head loss between the source and the reservoir is 31.5 m.

The Brake Horse Power of the pump is 1448.5 hp.

How to Solve the Problem?

We must utilize the provided facts to calculate the size of the trunk mains and matching velocity, head loss between the source and the reservoir, and the pump's Brake Horse Power.

(i) To determine the size of the trunk mains and the corresponding velocity:

Average daily demand = 200 L/person/day multiplied by 100,000 persons equals 20,000,000 L/day Maximum daily demand = 1.5 x 20,000,000 liters per day = 30,000,000 liters per day.The maximum hourly demand is 30,000,000 L/day divided by 24 hours equals 1,250,000 L/hour.Allowable speed = 1.0-1.5 m/sTo calculate the size of the trunk mains, apply the formula Q = VA, where Q is the flow rate, V is the velocity, and A is the pipe's cross-sectional area.When we solve for A in the preceding formula, we get A = Q/V.We further get get A = 1,250,000 L/hour 3.5 m/s = 357,143 mm2 by multiplying the maximum hourly demand by the permitted velocity.The pipe sizes available are 650 mm, 750 mm, 900 mm, and 1200 mm. The pipe size with the closest cross-sectional area to 357,143 mm2 is 900 mm.Therefore, the size of the trunk mains is 900 mm and the corresponding velocity is 1.39 m/s (1,250,000 L/hour ÷ 900 mm² ÷ 3600 s/hour).

(ii) To determine the head loss between the source and the reservoir:

Using the Darcy-Weisbach equation, we can compute the head loss as hL = f (L/D) (V2/2g), where f is the Darcy friction factor, L is the pipe length, D is the pipe diameter, V is the velocity, and g is the gravity acceleration.The Colebrook-White equation or a Moody chart can be used to compute the Darcy friction factor. Using the Moody chart and assuming a smooth pipe, we may obtain a friction factor of 0.015.The pipe's length is 4.5 kilometers (4500 meters).Using a pipe diameter of 900 mm and a velocity of 1.39 m/s, we obtain a Reynolds number of 1.2 x 107, indicating that the flow is turbulent.Using the Reynolds number and the friction factor, we can calculate the head loss as hL = 0.015 (4500 m/900 mm) (1.39 m/s)²/(2 x 9.81 m/s²) = 31.5 m.

(iii) To determine the Brake Horse Power of the pump:

Using the formula P = Qρgh/η, where P is the power, Q is the flow rate, ρ is the density of water, g is the acceleration due to gravity, h is the head, and η is the efficiency of the pump.The density of water is 1000 kg/m³.Using the maximum hourly demand and the head loss, we get a flow rate of 1,250,000 L/hour and a head of 25 m + 31.5 m = 56.5 m.Substituting the values into the formula, we get P = 1,250,000 L/hour x 1000 kg/m³ x 9.81 m/s² x 56.5 m / (0.65 x 3600 s/hour) = 1,080 kW or 1448.5 hp (1 hp = 0.7457 kW).Therefore, the Brake Horse Power of the pump is 1448.5 hp.

Learn more about  Darcy-Weisbach equation here:  https://brainly.com/question/30640818

#SPJ1

Who is allowed to participate in the Daily Scrum?

Answers

The Daily Scrum event is crucial in the Scrum framework, an agile project management approach. Development team members participate in this event, also called the Daily Stand-up. Only developers are allowed to attend the daily Scrum

What is the Daily Scrum?

This includes all development team members, including developers, testers, and other roles. The Daily Scrum syncs their work, facilitates collaboration, and progress towards Sprint goals.

This allows team members to share updates, discuss obstacles, plan activities, with the Scrum Master and Product Owner also present. Their role is to observe and support, not dominate or participate actively.

Learn more about Daily Scrum from

https://brainly.com/question/30081822

#SPJ4

true or false aluminum hydraulic showrooming permits both installation and removal without entering the trench

Answers

The statement "aluminum hydraulic showrooming permits both installation and removal without entering the trench" is false.

Showcasing is a process of placing pipes or other utilities in a trench using a specialized machine, usually a backhoe or an excavator. However, in the case of hydraulic showcasing, the machine used is a specialized pipe-pushing machine that pushes the pipes through the trench. While aluminum pipes are commonly used in hydraulic showcasing because of their durability and resistance to corrosion, they still require a skilled operator to push them through the trench. The operator needs to be able to see the progress of the pipes and adjust the machine accordingly, which means they need to be near the machine to operate it. Additionally, once the pipes are installed, they need to be connected to the existing plumbing system, which requires entering the trench to make the connections. Removal of the pipes would also require entering the trench to disconnect and remove the pipes. In summary, the statement that aluminum hydraulic showcasing permits both installation and removal without entering the trench is false. Skilled operators are needed to push the pipes through the trench, and connections need to be made by entering the trench.

To know more about aluminum visit:

brainly.com/question/28546980

#SPJ11

______________ is "A framework within which people can address complex adaptive problems, while productively and creatively delivering products of the highest possible value."

Answers

The term that describes the above-mentioned statement is Agile. Agile methodology is a framework that has been developed to help teams address complex adaptive problems while delivering products of the highest possible value in an efficient and creative manner.

Agile methodology emphasizes collaboration, flexibility, and customer satisfaction, and aims to respond to change quickly and effectively. The Agile approach is iterative, which means that work is broken down into smaller, more manageable pieces that are completed in short sprints. This allows for constant feedback and adjustment, ensuring that the end product is delivered in the most efficient and valuable way possible.One of the key principles of Agile is the involvement of the customer throughout the development process. This means that customer feedback is constantly taken into account, and the product is adjusted accordingly to meet their needs and expectations. By prioritizing customer satisfaction, the Agile approach is able to deliver high-quality products that meet the needs of the end user.Another important aspect of Agile is its focus on collaboration and teamwork. Agile teams work closely together, with each member contributing their unique skills and perspectives to the project. This fosters a culture of innovation and creativity, where ideas can be shared freely and problems can be solved collectively.

To know more about products visit:

brainly.com/question/31920147

#SPJ11

describe how to make a bluetooth connection from an ios device to another device.

Answers

This depends on whether or not the other device is an iOS device too. If it is:

1. On your device, open Settings and tap Bluetooth.

2. Make sure Bluetooth is turned on (the button should be green)

3. Check your Bluetooth device to make sure it’s turned on and in discovery mode. Wait for it to show up under My Devices below the Bluetooth setting on your device.

4. Tap the device name you want to pair with to initiate the connection. You may be asked to input a special code, but only if the device you’re connecting with requires one.

5. Your device is now ready to use when it shows “Connected” next to the name of the device. If it shows “Not Connected” simply tap the device name again to reconnect.

If it isn't an iOS device:

1. On your phone, open the Settings app and tap Bluetooth (or Settings > Connections > Bluetooth).

2. Make sure Bluetooth is turned on (the button should be blue).

3. Check your Bluetooth device and make sure it’s turned on and in discovery mode. Wait for it to show up under Available Devices on your phone.

4. Tap the name of your Bluetooth device under Available Devices.

5. Your device is ready to use when it shows “Connected” next to the name of the device. If it shows, “Not Connected” simply tap the device name again to reconnect.

Hope this helped! Reply to my answer again if you require further clarification, and remember to please give me Brainliest! :)

In the following circuit, the switch had been open for a long time until it closed at t=0 2 Find the following quantities. v_c(0) v_c(infinity) tau for t>0 i_c(t) for t>0 i_2(t) for t>0

Answers

v_c(0) = 0V

v_c(infinity) = 5V

tau = 1ms

i_c(t) for t>0 = 5e^(-1000t) mA

i_2(t) for t>0 = 2.5e^(-1000t) mA

Explanation:

When the switch is open for a long time, the capacitor is fully discharged, so v_c(0) = 0V.

When the switch is closed, the capacitor begins to charge through the 10k resistor. The time constant for the circuit is given by tau = RC = 10k0.1uF = 1ms. After a long time, the capacitor will be fully charged to the voltage of the source, so v_c(infinity) = 5V.

For t > 0, the current through the capacitor can be found using the equation i_c(t) = C*(dv_c(t)/dt). Solving for v_c(t), we get v_c(t) = 5*(1-e^(-t/tau))V. Taking the derivative of this expression with respect to time gives us i_c(t) = 5e^(-1000t) mA.

Finally, the current through the 2k resistor can be found using Ohm's law as i_2(t) = v_c(t)/2k. Substituting in the expression for v_c(t), we get i_2(t) = 2.5e^(-1000t) mA.

Learn more about Ohm's law here:

brainly.com/question/1247379

#SPJ11

Who does the work of delivering a potentially releasable Increment of "Done" product at the end of each Sprint?

Answers

In Agile software development, the Scrum framework is widely used to deliver high-quality software products through an iterative and incremental approach. One of the key roles in Scrum is the Scrum Team, which consists of three main roles - the Product Owner, the Scrum Master, and the Development Team.

The Development Team is responsible for delivering a potentially releasable Increment of "Done" product at the end of each Sprint. The Development Team is self-organizing and cross-functional, which means that it has all the necessary skills and expertise to complete the work required for the Sprint. The Development Team is also responsible for estimating the effort required for the Sprint and deciding how much work they can commit to delivering during the Sprint.During the Sprint, the Development Team works collaboratively to build and test the product increment. They use Agile development practices such as continuous integration, continuous delivery, and test-driven development to ensure that the product increment is of high quality and meets the Definition of Done (DoD) criteria.At the end of the Sprint, the Development Team presents the potentially releasable Increment of "Done" product to the Product Owner during the Sprint Review. The Product Owner then assesses the product increment against the product vision and decides whether to release it or continue development in the next Sprint.

To know more about software visit:

brainly.com/question/28900800

#SPJ11

machine breakdown and repair in a twelve-machine factory having one repair mechanic would represent which type of queuing system line structure?

Answers

Queuing theory is a mathematical approach used to study waiting lines or queues. It involves analyzing the arrival rate of customers, service rate, and the number of servers to determine the efficiency of a queuing system. One important aspect of queuing theory is the line structure of a system.

In the given scenario, a twelve-machine factory has only one repair mechanic. This means that the system has one server to attend to the breakdowns and repairs of all the machines. The arrival rate of machines that require repair is not specified in the question. However, we can assume that the arrival rate is unpredictable and can vary over time. The repair time of each machine is also not specified, but it is safe to assume that the repair time of each machine is constant and that the mechanic can work on only one machine at a time. Based on this information, we can say that the queuing system line structure in this scenario is a single-server, multiple queue system. The breakdowns and repairs of the machines represent the arrival process, and the mechanic represents the server. The machines waiting for repair form a queue, and the mechanic serves them one at a time.

In conclusion, the queuing system line structure in a twelve-machine factory with one repair mechanic is a single-server, multiple queue system. This means that the machines waiting for repair form a queue, and the mechanic serves them one at a time. Understanding the line structure of a queuing system is important in determining the efficiency of the system and making improvements where necessary.

To learn more about Queuing theory, visit:

https://brainly.com/question/29368697

#SPJ11

Which of the following tools/accessories provide protection against ESD?
(Select all that apply)
A. Antistatic bag
B. Ground mat
C. Tech bench
D. Antistatic wrist strap

Answers

The tools/accessories that provide protection against electrostatic discharge (ESD) include antistatic bag, ground mat, and antistatic wrist strap.

Antistatic bags are used to store electronic components or devices that are sensitive to ESD. These bags are made of materials that prevent the buildup of static electricity, thus protecting the components from being damaged by electrostatic discharge.

A ground mat is a conductive mat that is placed on a workbench or a floor to provide a ground path for any static charge that may build up on an object. This helps to prevent ESD damage to electronic components or devices that are placed on the mat.

An antistatic wrist strap is a wristband that is worn by a technician to prevent the buildup of static electricity on the body. The wrist strap is connected to a grounded surface, providing a path for static charge to flow away from the body and prevent damage to electronic components or devices that are being handled.

Learn more about electricity here: brainly.com/question/32140195

#SPJ11

One of the following definitions describes the correct characteristics of the Scrum team:

Answers

Scrum is a popular framework used for agile software development. It emphasizes teamwork, collaboration, and iterative progress towards a shared goal. The Scrum team is a crucial component of this framework, and it is essential to understand the correct characteristics of a Scrum team.

A Scrum team typically consists of three roles: the Product Owner, the Scrum Master, and the Development Team. The Product Owner is responsible for managing the product backlog, prioritizing features, and ensuring that the team is working towards the right goals. The Scrum Master is responsible for facilitating the Scrum process, removing any obstacles that may be preventing the team from achieving its goals, and ensuring that everyone is following the framework correctly. The Development Team is responsible for delivering a potentially releasable product increment at the end of each sprint.

The correct characteristics of a Scrum team include strong collaboration, a focus on delivering value, and a commitment to continuous improvement. The team must work together to achieve a shared goal, and each member must be accountable for their contributions. By following the Scrum framework and embodying these characteristics, the team can deliver high-quality software in a timely and efficient manner.

To learn more about Scrum, visit:

https://brainly.com/question/31720820

#SPJ11

Other Questions
a cns depressant often used to relieve anxiety is a(n) __________. the word gerrymandering was coined in 1812 because radar company sells bikes for $300 each. the company currently sells 3,750 bikes per year and could make as many as 5,000 bikes per year. the bikes cost $225 each to make: $150 in variable costs per bike and $75 of fixed costs per bike. radar receives an offer from a potential customer who wants to buy 750 bikes for $250 each. incremental fixed costs to make this order are $60 per bike. no other costs will change if this order is accepted. (a) compute the income for the special offer. (b) should radar accept this offer? how to install the prier quarter-turn frost free anti-siphon outdoor hydrant with threaded connection if planck's constant were approximately 50% bigger, would atoms be larger or smaller? What is the volume of the pyramid? Air New Zealands first flight from Auckland to Sydney took nine hours. Today it usually takes about three hours. Find the percentage decrease in flight time between the first flight time and now? the type of transaction most suitable for batch processing is a. airline reservations b. payroll processing c. credit authorization d. adjustments to perpetual inventory Let R be the region in the first quadrant bounded by the graphs of y = sqrt of x and y = x/3a. Find the area of Rb. Find the volume of the solid generated when R is rotated about the vertical line x = -1c. The region R is the base of a solid. For this solid, the cross sections perpendicular to the y-axis are squares. Find the volume of the solid. 1) Which of the following choices is NOT associated with a redox reaction in the Kreb's cycle?A. The production of NADHB. The production of FADH2C. The production of CO2D. The production of Acetyl-CoA2) NADH is produced in glycolysis by the reduction of NAD+. Which of the statements below is TRUE, regarding the production of NADH during glycolysis?A. NADH is used to phosphorylate ADP to make ATP.B. Another molecule was oxidized in order to reduce NAD+.C. NADH can be used to power many different processes within the cell.D. NADH was oxidized in order to reduce NAD+. when using the retail method to approximate average cost, the cost-to-retail percentage is applied to which goods? The acronym SLUDGE helps identify the effects of ________ drugs on the autonomic nervous system.a. Sympathomimeticb. Sympatholyticc. Parasympathomimeticd. Parasympatholytic explain why sodium (na has a smaller radius than cesium (cs)) what rapper turned actor had a hit with the 1988 song "parents just don't understand"? if sunflower is 250ml and costs R14.99 how much will it cost if it was 1L what is a tax preparer's correct response to a taxpayer who omitted items on an income tax return which was submitted in a previous year? advise the taxpayer promptly of the fact of such omission and: refuse to prepare the current-year return until the previous-year return is amended. make an adjustment for the previous year's omission on the current-year return. advise them of the consequences for such omissions as provided under the internal revenue code and preparer regulations. dan receives a proportionate current (nonliquidating) distribution when the basis of his partnership interest is $30,000. the distribution consists of $10,000 in cash and property with an adjusted basis to the partnership of $24,000 and a fair market value of $26,500. dan's basis in the noncash property is: (T/F) each activity within the systems analysis phase has an end product and one or more milestones. Liz starts driving rashly after buying insurance. This is an example of a(n):A. moral-hazard problem.B. common-resource problem.C. negative externality.D. free-rider problem. what is the fundamental difference between a fixed-price and a cost-plus contract?