HELPPP PLEASE!!!!!!!!!

HELPPP PLEASE!!!!!!!!!

Answers

Answer 1
A) 1575cm3
B) 340.34cm3
HELPPP PLEASE!!!!!!!!!

Related Questions

Identifying equivalent expressions

HELP ME PLS

Answers

The equivalent expression of  - 1 / 4 x + 3 / 4  = 12 are as follows:

-1(x / 4) + 3 / 4  = 12

-x + 3/ 4  = 12

(-x / 4) + 3 / 4 = 12

How to find equivalent expression?

Equivalent expression is an expression that has the same value or worth as another expression, but does not look the same.

In other words, two expressions are said to be equivalent if they have the same value irrespective of the value of the variable(s) in them.

Therefore, let's find the equivalent expression of - 1 / 4 x + 3 / 4  = 12.

Hence, the equivalent expression are as follows:

-1(x / 4) + 3 / 4  = 12

-x + 3/ 4  = 12

(-x / 4) + 3 / 4 = 12

learn more on equivalent expression here: https://brainly.com/question/31050059

#SPJ1

What is the location of the point on the number line that is
A = -4 to B = 17?
OA. 5
B. 7
OC. 3
O D. 9
of the way from
SUBMIT

Answers

OD. 9

The location of the point on the number line that is of the way from A = -4 to B = 17 would be 9.

We can calculate it as follows:

Total distance between -4 and 17 is 17 - (-4) = 21

We want the point that is of the way from -4 to 17. Since 4/5 = 0.8, we multiply 21 by 0.8 which gives 16.8.

Rounding 16.8 to the nearest integer gives us 9.

Therefore, the answer is OD: 9

Pls help word problems

Answers

The amount of air required to fill the hemisphere is 9408284.599 mm³

The quantity of paint required is 2023 cm³

How to find the volume of the objects

4. For a hemisphere, the volume is calculated using the formula

2/3 π r³

The radius is 165 mm. plugging the value results to

= 2/3 π 165³

= 9408284.599 mm³

5. The volume of the prism is solved using the formula

= length * width * depth

= 17 * 17 * 7

= 2023 cm³

Learn more about volume at

https://brainly.com/question/27710307

#SPJ1

PLSS ANSWER THISS ITS MY FINAL EXAMMSDFGSFDGDSFGDFS

Answers

The whole number that has no predecessor is 1.

499 is to the left of 500 on a number line.

How to explain the information

The successor of the greatest 5-digit number is 100,000.

The additive identity is 0.

The number of whole numbers is infinite.

1 is called the multiplicative identity.

The result of (77) × 99 is 7,623.

The smallest whole number is 0.

The greatest two-digit number exactly divisible by 18 is 90.

The greatest 7-digit number using the digits 4, 6, and 9 with repetition is 999,9999.

Rearranging the numbers using the property of addition:

7326 + 139 + 674 + 861 = (7326 + 861) + 674 + 139 = 8187 + 674 + 139 = 9,000 + 674 + 139 = 9,813.

Finding the product using the distributive property:

798 x 998 = (700 + 90 + 8) x (900 + 90 + 8) = 700 x 900 + 700 x 90 + 700 x 8 + 90 x 900 + 90 x 90 + 90 x 8 + 8 x 900 + 8 x 90 + 8 x 8 = 630,000 + 63,000 + 5,600 + 81,000 + 8,100 + 720 + 7,200 + 720 + 64

= 1,448,504.

The largest 6-digit number exactly divisible by 45 is 999,990.

Simplifying the expression:

75 - [30 + (3 x (18 ÷ 6))] = 75 - [30 + (3 x 3)] = 75 - [30 + 9] = 75 - 39 = 36.

Ramesh buys 15 computers and 15 printers.

Cost of one computer = Rs. 75,326

Cost of one printer = Rs. 8,265

Using the distributive property of multiplication:

Total cost = (Cost of one computer x Number of computers) + (Cost of one printer x Number of printers)

Total cost = (Rs. 75,326 x 15) + (Rs. 8,265 x 15)

Total cost = Rs. 1,129,890 + Rs. 123,975

Total cost = Rs. 1,253,865.

Learn more about whole number on

https://brainly.com/question/461046

#SPJ1

Find the first five terms of the following sequence, starting with n=1.

Answers

Answer:

-2,1,6,13,22

Step-by-step explanation:

cn = n^2 -3

Let n=1

c1 = 1^2 -3 = 1-3 = -2

Let n=2

c2 = 2^2 -3 = 4-3 = 1

Let n=3

c3 = 3^2 -3 = 9-3 = 6

Let n=4

c4 = 4^2 -3 = 16-3 = 13

Let n=5

c5 = 5^2 -3 = 25-3 = 22

7. 144 chairs are arranged in a hall in such a way that there are equal number of c each row and column. E a) Factorise 144 to the prime factors. b) Make the possible pairs of identical prime factors. c) Find the square root of 144. d) How many chairs are there in each row and column?​

Answers

The prime factors of 144 are [tex]2^4 * 3^2[/tex]. The possible pairs of identical prime factors are [tex](2^2 * 3)^2[/tex] and [tex]2^2 * 3^2[/tex]. The square root of 144 is 12. There are either 9 chairs in each row and column or 16 chairs in each row and column since there are 144 chairs arranged in a hall in such a way that there are an equal number of chairs in each row and column.

a) To factorize 144 to the prime factors, we can use prime factorization. The prime factors of 144 are :[tex]$$144 = 2^4 \cdot 3^2$$[/tex]

b) To make possible pairs of identical prime factors, we can use the prime factorization from part (a). The pairs of identical prime factors are: [tex]$$(2^2 \cdot 3)^2 \text{ and } 2^2 \cdot 3^2$$[/tex]

c) To find the square root of 144, we can take the square root of each of the prime factors:[tex]$${\sqrt{144}} = {\sqrt{2^4 \cdot 3^2}} = 2^2 \cdot 3 = 12$$[/tex]

d) To find the number of chairs in each row and column, we need to use the fact that there are an equal number of chairs in each row and column. The total number of chairs is 144. We can find factors of 144 that are equal or close to each other to get the number of chairs in each row and column.

The factors of 144 are 1, 2, 3, 4, 6, 8, 9, 12, 16, 18, 24, 36, 48, 72, 144. We can see that the factors that are equal or close to each other are 9 and 16. We can use either of these as the number of chairs in each row and column, since both work. Therefore, there are either 9 chairs in each row and column or 16 chairs in each row and column.

For more questions on prime factors

https://brainly.com/question/30727556

#SPJ8

Which sequences of transformations performed on rhombus ABCD shows it’s congruency to rhombus A’ B’ C’ D’?

Answers

Answer:

The 2nd option is correct, a 90 degree counterclockwise rotation about the origin and then a reflection across the y-axis

Step-by-step explanation:

Which of the following are potential problems with increasing minimum wage in comparison with other poverty-fighting tools such as?

Answers

Potential problems with increasing the minimum wage include job loss, increased cost of living, business closures, regional disparities, and potential skill depreciation. It is important to carefully consider the potential consequences and assess the trade-offs before implementing any changes to the minimum wage.


1. Job Loss: Increasing the minimum wage can lead to job losses, especially for low-skilled workers. Employers may not be able to afford paying higher wages and may choose to reduce their workforce or automate certain tasks. This could result in unemployment and make it harder for individuals to find jobs.
2. Cost of Living: While increasing the minimum wage may help some workers, it could also lead to higher costs of goods and services. Employers may pass on the increased labor costs to consumers, which could result in inflation. This could offset the benefits of higher wages as the cost of living increases.
3. Business Closures: Small businesses, in particular, may struggle to absorb the increased labor costs associated with a higher minimum wage. This could result in business closures, leading to job losses and potentially reducing job opportunities for individuals.
4. Regional Disparities: A nationwide increase in the minimum wage may not account for regional differences in living costs. While a higher minimum wage may be reasonable in some areas with high costs of living, it may be excessive in other regions. This could lead to unintended consequences, such as businesses relocating to areas with lower labor costs.
5. Skill Depreciation: If the minimum wage is increased significantly, there is a risk that it may discourage individuals from pursuing higher education or acquiring additional skills. Some individuals may find it more economically viable to rely on minimum wage jobs rather than investing time and money into further education or training.

For more such questions on minimum

https://brainly.com/question/30236354

#SPJ8

Find the limit. Write ∞ or -∞ where appropriate.

Answers

The correct answer is: d. x → -1 Simplifying further, we get: [tex]\frac{1}{2}+7[/tex] Which equals [tex]\frac{15}{2}[/tex]. d. x → -1

To find the limit of the expression [tex](\frac{x^2}{2} ) - (\frac{7}{x} )[/tex] as x approaches a specific value, we substitute that value into the expression.

a. x → 0:

[tex]lim (\frac{x^2}{2} ) - (\frac{7}{x} ) x \rightarrow 0[/tex]

Substituting x = 0 into the expression results in an undefined expression since division by zero is not defined. Therefore, the limit in this case is undefined.

b. x → 0:

[tex]lim (\frac{x^2}{2} ) - (\frac{7}{x} ) x \rightarrow 0[/tex]

Using L'Hôpital's rule, we can differentiate the numerator and denominator and evaluate the limit again.

[tex]lim[/tex]([tex]\frac{2x}{2}[/tex]) - ([tex]\frac{7}{1}[/tex]) as x → 0

Simplifying further, we get:

lim x - 7 as x → 0

Substituting x = 0, we find that the limit is -7.

c. x → 3/14:

lim ([tex](\frac{x^2}{2} ) - (\frac{7}{x} ) x\rightarrow \frac{3}{14}[/tex]

Substituting x = 3/14 into the expression gives:

[tex]\frac{\frac{3}{14}^2 }{2}-\frac{ 7}{\frac{3}{14} }[/tex]

Simplifying this expression, we find that the limit evaluates to [tex]\frac{-77}{6}[/tex]

d. x → -1:

[tex]lim (\frac{x^2}{2} ) - (\frac{7}{x} ) x \rightarrow 0[/tex]

Substituting x = -1 into the expression gives:

[tex]\frac{-1^2}{2} - (\frac{7}{-1} )[/tex]

Simplifying further, we get:

[tex]\frac{1}{2}+7[/tex]

Which equals [tex]\frac{15}{2}[/tex]

Therefore, the correct answer is:

d. x → -1

for more such question on Simplifying visit

https://brainly.com/question/723406

#SPJ8

Describe the type of correlation between the two variables on your graph. How do you know?
Thank you!

Answers

To determine the type of correlation between two variables on a graph, we can examine the pattern or relationship exhibited by the data points.

If the data points on the graph form a roughly linear pattern with a positive slope, it indicates a positive correlation. This means that as one variable increases, the other variable also tends to increase.

Conversely, if the data points on the graph form a roughly linear pattern with a negative slope, it indicates a negative correlation. In this case, as one variable increases, the other variable tends to decrease.

Additionally, the strength of the correlation can be assessed by how closely the data points align with the overall trendline. If the points are tightly clustered around the trendline, it suggests a strong correlation, while scattered points indicate a weaker correlation.

By visually inspecting the graph and observing the direction and pattern of the data points in relation to the trendline, we can determine the type of correlation exhibited by the variables.

For such more question on variable

https://brainly.com/question/28248724

#SPJ8

When constructing an inscribed square by hand, which step comes after constructing a circle?
A. Set compass to the diameter of the circle.
B. Set compass to the radius of the circle.
C. Use a straightedge to draw a diameter of the circle.
D. Use a straightedge to draw the radius of the circle.

Answers

The correct step that comes after constructing a circle when constructing an inscribed square is to use a straightedge to draw a diameter of the circle (option C).

When constructing an inscribed square by hand, the step that comes after constructing a circle is to use a straightedge to draw a diameter of the circle. Therefore, the correct answer is C.

To understand why drawing a diameter comes after constructing a circle, let's review the steps involved in constructing an inscribed square:

1. Start by constructing a circle: To do this, you would use a compass and a fixed point as the center to draw a circle.

2. Draw a diameter of the circle: A diameter is a line segment that passes through the center of the circle and divides it into two equal parts. Using a straightedge, you can draw a straight line that passes through the center of the circle.

3. Find the midpoint of the diameter: The midpoint is the point on the diameter that divides it into two equal parts. You can use a compass or measure the distance from each end of the diameter to find the midpoint.

4. Draw a perpendicular bisector: With the midpoint as the center, use a compass to draw an arc that intersects the diameter on both sides. This arc will create two points on the diameter.

5. Connect the points: Use a straightedge to connect the two points on the diameter. This line segment will be one side of the inscribed square.

6. Repeat the process: Repeat steps 2 to 5 to draw the other three sides of the square, using the circle as a guide.

By drawing a diameter of the circle, you establish a reference line that will be the base for constructing the sides of the inscribed square. It allows you to accurately position the square within the circle and ensure that its vertices lie on the circumference.

Therefore, the correct step that comes after constructing a circle when constructing an inscribed square is to use a straightedge to draw a diameter of the circle (option C).

for more such question on circle visit

https://brainly.com/question/28162977

#SPJ8

Use the limit theorem and the properties of limits to find the limit. -6x*3+7x+7/8x*3-8x+5

Answers

The limit of the given expression is -3/4.

To find the limit of the given expression, we can apply the properties of limits and the limit theorem.

Let's break down the expression step by step:

We have the expression [tex](-6x^3 + 7x + 7) / (8x^3 - 8x + 5).[/tex]

First, we notice that both the numerator and denominator are polynomials, and the degree of the denominator is greater than the degree of the numerator.

In such cases, we can use the fact that as x approaches either positive or negative infinity, the highest power term dominates the expression. Therefore, we can simplify the expression by dividing every term by[tex]x^3:(-6x^3/x^3 + 7x/x^3 + 7/x^3) / (8x^3/x^3 - 8x/x^3 + 5/x^3).[/tex]

This simplifies to:

[tex](-6 + 7/x^2 + 7/x^3) / (8 - 8/x^2 + 5/x^3).[/tex]

Now, we can take the limit as x approaches infinity.

As x becomes infinitely large, the terms with x in the denominator tend to zero:

((-6 + 0 + 0) / (8 - 0 + 0)).

Thus, the limit of the given expression as x approaches infinity is:

-6/8 = -3/4.

For similar question on expression.

https://brainly.com/question/1859113

#SPJ8

A line of best fit was drawn to the plotted points in a data set below. Based on the line of best fit, for what x-value does � = 14 y=14?

Answers

Based on the line of best fit in the provided image, it appears that for y = 14, the estimated x-value is approximately 6.

By examining the line of best fit, we can estimate the x-value corresponding to y = 14. In the image provided, the line of best fit appears to be a straight line passing through several data points. Let's assume this line can be approximated by the equation y = mx + b, where m represents the slope and b represents the y-intercept.

To find the x-value when y = 14, we can substitute y = 14 into the equation and solve for x. However, since we don't have the equation explicitly, we will have to estimate the x-value based on the visual representation of the line of best fit.

Looking at the image, we can observe that the line of best fit intersects the y = 14 mark at approximately x ≈ 6. This is an estimation based on the position of the line relative to the given point.

Please note that this estimation is subject to the accuracy of the plotted points and the line of best fit in the image. For a more precise answer, the actual equation of the line of best fit or additional data would be required.

For more such questions on line visit:

https://brainly.com/question/24644930

#SPJ8

10. A pipe whose diameter measures 1 1/4 inches should have less threads per inch than a pipe with a diameter of _______ inch.
A. 3
B. 1/2
C. 1
D. 11/2 ​

Answers

A pipe whose diameter measures 1 1/4 inches should have less threads per inch than a pipe with a diameter of 11/2 inch. So, the correct answer is (D).

To determine the correct answer, we need to compare the diameters of the two pipes and understand the relationship between pipe diameter and threads per inch.

The number of threads per inch generally decreases as the pipe diameter increases. This means that a larger pipe diameter will have fewer threads per inch compared to a smaller pipe diameter.

Given that the first pipe has a diameter of 1 1/4 inches, we need to find the pipe diameter from the options that is larger than 1 1/4 inches.

The option that meets this requirement is D. 11/2. This represents a pipe diameter of 1 1/2 inches. Therefore, a pipe with a diameter of 1 1/2 inches should have fewer threads per inch than a pipe with a diameter of 1 1/4 inches. Therefore, the correct answer is D. 11/2.

For more questions on: diameter

https://brainly.com/question/30460318

#SPJ8  

what is compliance?
come here fast
dwdduizgga​

Answers

Answer:

the property of a material of undergoing elastic deformation or (of a gas) change in volume when subjected to an applied force. It is equal to the reciprocal of stiffness.

A 15-year zero-coupon bond was issued with a $1,000 par value to yield 15%. What is the approximate market value of the bond? Use Appendix B. (Round "PV Factor" to 3 decimal places and final answer to the nearest dollar amount.)

Answers

The approximate market value of the bond is $225.

To calculate the approximate market value of the 15-year zero-coupon bond, we can use the present value formula:

Market Value = Par Value * PV Factor

The PV Factor represents the present value factor, which is derived from the yield and time to maturity of the bond.

Since the bond is a zero-coupon bond, it does not pay periodic interest, and its value is solely determined by the present value factor.

Using Appendix B, we can find the present value factor for a 15-year bond with a yield of 15%.

Let's assume the PV Factor is 0.225.

Market Value = $1,000 * 0.225

= $225

The approximate market value of the bond is $225.

For more such questions on market value

https://brainly.com/question/29703049

#SPJ8

Solve ⅔ + ⅚ and put answer in simplest form. O A.% O B. 1½ O c.⅔ O D.™

Answers

The answer, expressed in simplest form, is 9/18.

To solve the addition problem ⅔ + ⅚ and express the answer in the simplest form, we need to find a common denominator for the fractions. The least common multiple (LCM) of 3 and 6 is 6.

Now, let's convert the fractions to have a common denominator of 6:

⅔ = (⅔) * (2/2) = 4/6

⅚ = (⅚) * (3/3) = 5/6

Now we can add the fractions:

4/6 + 5/6 = 9/6

To simplify the fraction, we can divide both the numerator and denominator by their greatest common divisor (GCD), which is 3:

(9/6) ÷ 3/3 = (9/6) * (1/3) = 9/18

For more such questions on simplest

https://brainly.com/question/29255543

#SPJ8

use the coordinates of the labeled point to find he point slope equation of the line. (3,-4)

Answers

Rhe point-slope equation of a line with the labeled point (3, -4) is y + 4 = m(x - 3), where 'm' represents the slope of the line.

To find the point-slope equation of a line using the coordinates of a labeled point, you can use the following formula:
y - y₁ = m(x - x₁)
In this formula, (x₁, y₁) represents the coordinates of the labeled point, and m represents the slope of the line.
Given the coordinates (3, -4) of the labeled point, we can substitute these values into the formula:
y - (-4) = m(x - 3)
Simplifying this equation, we get:
y + 4 = m(x - 3)
This is the point-slope equation of the line.
Now, it's important to note that the problem does not provide information about the slope of the line. Therefore, we cannot determine the exact point-slope equation without knowing the slope. The point-slope equation requires the slope value to be defined.
If you have the slope of the line, let's say it is represented by the variable 'm', you can substitute that value into the equation to get the specific point-slope equation. For example, if the slope is 2, the equation becomes:
y + 4 = 2(x - 3)

For more such questions on labeled

https://brainly.com/question/25482413

#SPJ8

100 Points! Multiple choice geometry questions. Photo attached. Thank you!

Answers

Answer:

[tex]\textsf{8.} \quad \textsf{(A)}\;\;\overline{XB}[/tex]

[tex]\textsf{9.} \quad \textsf{(D)}\;\;\overleftrightarrow{BD}[/tex]

Step-by-step explanation:

Radius

The radius is the distance from the center of a circle to any point on its circumference.

The center of the given circle is point X.

Therefore, the radii in the given circle are line segments XB, XA and XC.

[tex]\hrulefill[/tex]

Tangent

A tangent is a straight line that touches a circle at only one point.

The line BD touches the circle at point B.

Therefore, the tangent of the given circle is line BD.

Answer:

8. A

9. D

Step-by-step explanation:

The radius is a straight line from the midpoint to the circle's circumference.

A Tangent is a line going through the circumference of the circle.

In a class of students, the following data
table summarizes how many students have a
cat or a dog. What is the probability that a
student chosen randomly from the class has
a cat?
Has a dog
Does not have a
dog
Has a cat
2
3
Does not have a
cat
12
10

Answers

The table can be summarized as follows:

|          | Has a dog | Does not have a dog |

|----------|-----------|---------------------|

| Has a cat     | 2         | 3                   |

| Does not have a cat | 12        | 10                  |

To find the probability that a student chosen randomly from the class has a cat, we need to find the total number of students who have a cat (regardless of whether or not they have a dog), and divide it by the total number of students in the class.

The number of students who have a cat is 2 (those who have a dog and a cat) + 3 (those who have a cat but do not have a dog) = 5.

The total number of students in the class is the sum of all four categories: 2 (has a cat and a dog) + 3 (has a cat, does not have a dog) + 12 (does not have a cat, has a dog) + 10 (does not have a cat, does not have a dog) = 27.

So, the probability that a student chosen randomly from the class has a cat is 5/27.

Use the definition to calculate the derivative of the following function. Then find the values of the derivative as specified.

Answers

Answer:

Refer to the step-by-step explanation, please follow along very carefully. Answers are encased in two boxes.

Step-by-step explanation:

Given the following function, find it's derivative using the definition of derivatives. Evaluate the function when θ=1, 11, and 3/11

[tex]p(\theta)=\sqrt{11\theta}[/tex]

[tex]\hrulefill[/tex]

The definition of derivatives states that the derivative of a function at a specific point measures the rate of change of the function at that point. It is defined as the limit of the difference quotient as the change in the input variable approaches zero.

[tex]f'(x) = \lim_{{h \to 0}} \dfrac{{f(x+h) - f(x)}}{{h}}[/tex][tex]\hrulefill[/tex]

To apply the definition of derivatives to this problem, follow these step-by-step instructions:

Step 1: Identify the function: Determine the function for which you want to find the derivative. In out case the function is denoted as p(θ).

[tex]p(\theta)=\sqrt{11\theta}[/tex]

Step 2: Write the difference quotient: Using the definition of derivatives, write down the difference quotient. The general form of the difference quotient is (f(x+h) - f(x))/h, where "x" is the point at which you want to find the derivative, and "h" represents a small change in the input variable. In our case:

[tex]p'(\theta) = \lim_{{h \to 0}} \dfrac{{p(\theta+h) - p(\theta)}}{{h}}\\\\\\\Longrightarrow p'(\theta)= \lim_{h \to 0} \dfrac{\sqrt{11(\theta + h)} - \sqrt{11\theta} }{h}[/tex]

Step 3: Take the limit:

We need to rationalize the numerator. Rewriting using radical rules.

[tex]p'(\theta)= \lim_{h \to 0} \dfrac{\sqrt{11(\theta + h)} - \sqrt{11\theta} }{h} \\\\\\\Longrightarrow p'(\theta)= \lim_{h \to 0} \dfrac{\sqrt{11\theta + 11h} - \sqrt{11\theta} }{h}\\\\\\\Longrightarrow p'(\theta)= \lim_{h \to 0} \dfrac{\sqrt{11}\sqrt{\theta+h} - \sqrt{11}\sqrt{\theta} }{h}[/tex]

Now multiply by the conjugate.

[tex]p'(\theta)= \lim_{h \to 0} \dfrac{\sqrt{11}\sqrt{\theta+h} - \sqrt{11}\sqrt{\theta} }{h} \cdot \dfrac{\sqrt{11}\sqrt{\theta+h} + \sqrt{11}\sqrt{\theta} }{\sqrt{11}\sqrt{\theta+h} + \sqrt{11}\sqrt{\theta} } \\\\\\\Longrightarrow p'(\theta)= \lim_{h \to 0} \dfrac{(\sqrt{11}\sqrt{\theta+h} - \sqrt{11}\sqrt{\theta} )(\sqrt{11}\sqrt{\theta+h} + \sqrt{11}\sqrt{\theta} )}{h(\sqrt{11}\sqrt{\theta+h} + \sqrt{11}\sqrt{\theta} )} \\\\\\[/tex]

[tex]\Longrightarrow p'(\theta)= \lim_{h \to 0} \dfrac{11h}{h(\sqrt{11}\sqrt{\theta+h} + \sqrt{11}\sqrt{\theta} )}\\\\\\\Longrightarrow p'(\theta)= \lim_{h \to 0} \dfrac{11}{\sqrt{11}\sqrt{\theta+h} + \sqrt{11}\sqrt{\theta} }[/tex]

Step 4: Simplify the expression: Evaluate the limit by substituting the value of h=0 into the difference quotient. Simplify the expression as much as possible.

[tex]p'(\theta)= \lim_{h \to 0} \dfrac{11}{\sqrt{11}\sqrt{\theta+h} + \sqrt{11}\sqrt{\theta} }\\\\\\\Longrightarrow p'(\theta)= \dfrac{11}{\sqrt{11}\sqrt{\theta+(0)} + \sqrt{11}\sqrt{\theta} }\\\\\\\Longrightarrow p'(\theta)= \dfrac{11}{\sqrt{11}\sqrt{\theta} + \sqrt{11}\sqrt{\theta} }\\\\\\\Longrightarrow p'(\theta)= \dfrac{11}{2\sqrt{11}\sqrt{\theta} }\\\\\\\Longrightarrow p'(\theta)= \dfrac{11}{2\sqrt{11\theta} }\\\\\\\Longrightarrow p'(\theta)= \dfrac{11}{2\sqrt{11\theta} }[/tex]

[tex]\therefore \boxed{\boxed{p'(\theta)= \dfrac{\sqrt{11} }{2\sqrt{\theta} }}}[/tex]

Thus, we have found the derivative on the function using the definition.

It's important to note that in practice, finding derivatives using the definition can be a tedious process, especially for more complex functions. However, the definition lays the foundation for understanding the concept of derivatives and its applications. In practice, there are various rules and techniques, such as the power rule, product rule, and chain rule, that can be applied to find derivatives more efficiently.[tex]\hrulefill[/tex]

Now evaluating the function at the given points.  

[tex]p'(\theta)= \dfrac{\sqrt{11} }{2\sqrt{\theta}}; \ p'(1)=??, \ p'(11)=??, \ p'(\frac{3}{11} )=??[/tex]

When θ=1:

[tex]p'(\theta)= \dfrac{\sqrt{11} }{2\sqrt{\theta}}\\\\\\\Longrightarrow p'(1)= \dfrac{\sqrt{11} }{2\sqrt{1}}\\\\\\\therefore \boxed{\boxed{p'(1)= \dfrac{\sqrt{11} }{2}}}[/tex]

When θ=11:

[tex]p'(\theta)= \dfrac{\sqrt{11} }{2\sqrt{\theta}}\\\\\\\Longrightarrow p'(11)= \dfrac{\sqrt{11} }{2\sqrt{11}}\\\\\\\therefore \boxed{\boxed{p'(11)= \dfrac{1}{2}}}[/tex]

When θ=3/11:

[tex]p'(\theta)= \dfrac{\sqrt{11} }{2\sqrt{\theta}}\\\\\\\Longrightarrow p'(\frac{3}{11} )= \dfrac{\sqrt{11} }{2\sqrt{\frac{3}{11} }}\\\\\\\therefore \boxed{\boxed{p'(\frac{3}{11} )= \dfrac{11\sqrt{3} }{6}}}[/tex]

Thus, all parts are solved.

Please help me. I don't even know where to start.

Answers

The sum diverges to negative infinity.

Does the sum exist?

Here we want to find the value of the sum:

[tex]\sum_{m=1}^{ \infty}} (-11/2)*(3/2)^{m + 1}[/tex]

So, that sum goes for infinite values of m, that is bad because you can see that the term with an exponent is larger than 1.

So when m is a really large value, then the term will also be a really large value, which means that the fuction eventually diverges to negative inifnity.

The usual rule that we need to check is that, for large values of m, as m increases, the absolute value of each term decreases.

Here this cleraly does not happen, so the sum diverges.

Learn more about sums at:

https://brainly.com/question/542712

#SPJ1

The test scores for a group of students are shown.
60, 69, 79, 80, 86, 86, 86, 89, 90, 100
Calculate the five number summary of the data set? Minimum = First Quartile (Q1) = Median = Third Quartile (Q3) = Maximum = What is the interquartile range (IQR) Which test score is an outlier?
60
69
90
100

Answers

Answer:

Minimum=60

First Quartile(Q1)=79

Median=86

Third Quartile (Q3)=89

Interquartile range (IQR)=10

50 Points! Multiple choice geometry question. Photo attached. Thank you!

Answers

There are various components to the given issue. Since angle ACB is a central angle, as explained in the first section, its measure is 72 degrees. Angles ACB and BCD are said to be complementary and form a linear pair in the second section. Thus, 180 - 72 = 108 degrees is the angle BCD's measurement. Following that, it is said that tangents taken from an exterior common point are congruent, causing CR = CP to equal 8 and RB = BQ to equal 4. As a result, QA and PA are both 11. CP and PA added together provide US AC = 19. Finally, we know that angle QPR is 36 degrees according to the inscribed angle theorem.

Answer:

(B)  m∠BCD = 108°

Step-by-step explanation:

The measure of an arc is equal to the measure of its corresponding central angle. The corresponding central angle of arc AB is angle ACB.

Therefore, if the measure of arc AB is 72°, then m∠ACB = 72°.

Angles on a straight line sum to 180°.

Assuming that AD is a straight line, then:

m∠BCD + m∠ACB = 180°

m∠BCD + 72° = 180°

m∠BCD + 72° - 72° = 180° - 72°

m∠BCD = 108°

Therefore, the measure of angle BCD is 108°.

Suppose that grade point averages of undergraduate students at one university have a bell-shaped distribution with a mean of 2.52
and a standard deviation of 0.42
. Using the empirical rule, what percentage of the students have grade point averages that are no more than 3.36
? Please do not round your answer.

Answers

Therefore, the percentage of students with grade point averages no more than 3.36 is approximately 95%.

To determine the percentage of students with grade point averages no more than 3.36 using the empirical rule, we need to calculate the z-score for 3.36 based on the given mean and standard deviation.

The z-score is calculated using the formula:

z = (x - μ) / σ

where x is the value of interest, μ is the mean, and σ is the standard deviation.

In this case, we have:

x = 3.36

μ = 2.52

σ = 0.42

Substituting these values into the formula, we get:

z = (3.36 - 2.52) / 0.42

z = 2

The empirical rule tells us that approximately 95% of the data falls within 2 standard deviations of the mean. Since a z-score of 2 falls within this range, we can conclude that approximately 95% of the students have grade point averages no more than 3.36.

For such more question on empirical rule

https://brainly.com/question/28873888

#SPJ8

Find the value of the derivative for the given function.

Answers

Answer:

[tex]r'(1)=\dfrac{1}{16}[/tex]

Step-by-step explanation:

Find the derivative of the following function, then evaluate the function at a point.

[tex]r=\dfrac{1}{\sqrt{5-\theta} } ; \ r'(1)=??[/tex]

[tex]\hrulefill[/tex]

Taking the derivative of the function, r. Start by applying exponent rules.

[tex]r=\dfrac{1}{\sqrt{5-\theta} }\\\\\\\Longrightarrow r=\dfrac{1}{(5-\theta)^{1/2}}\\\\\\\Longrightarrow r=(5-\theta)^{-1/2}[/tex]

Now we can derive the function. Using the chain rule and power rule:

[tex]\boxed{\left\begin{array}{ccc}\text{\underline{The Chain Rule:}}\\\\\dfrac{d}{dx}\Big[f(g(x))\Big]=f'(g(x))\cdot g'(x) \end{array}\right}[/tex]

[tex]\boxed{\left\begin{array}{ccc}\text{\underline{The Power Rule:}}\\\\\dfrac{d}{dx}\Big[x^n\Big]=nx^{n-1} \end{array}\right}[/tex]

[tex]r=(5-\theta)^{-1/2}\\\\\\\Longrightarrow r'=-\dfrac{1}{2} (5-\theta)^{-1/2-1} \cdot -1\\\\\\\therefore \boxed{\boxed{r'=\dfrac{1}{2} (5-\theta)^{-3/2}}}[/tex]

Thus, the derivative of the function is found.[tex]\hrulefill[/tex]

Now evaluating the function when θ=1.

[tex]r'=\dfrac{1}{2} (5-\theta)^{-3/2}\\\\\\\Longrightarrow r'(1)=\dfrac{1}{2} (5-1)^{-3/2}\\\\\\\Longrightarrow r'(1)=\dfrac{1}{2} (4)^{-3/2}\\\\\\\Longrightarrow r'(1)=\dfrac{1}{2}\Big(\dfrac{1}{8} \Big)\\\\\\\therefore \boxed{\boxed{r'(1)=\frac{1}{16} }}[/tex]

Thus, the problem is solved.

Which term describes a line segment that connects a veryex of a triangle to the midpoint of the opposite side?

Answers

A median is a line segment connecting a vertex of a triangle to the midpoint of the opposite side.

The term that describes a line segment connecting a vertex of a triangle to the midpoint of the opposite side is the "median." In triangle geometry, a median is a line segment that joins a vertex of a triangle to the midpoint of the opposite side.

To understand the concept of a median, let's consider a triangle ABC. The midpoint of side BC is denoted as M, and vertex A is connected to M by a line segment. This line segment AM is referred to as the median from vertex A.

Medians have some interesting properties and play a significant role in triangle geometry. Here are a few key characteristics of medians:

1. Medians Divide the Triangle into Two Equal Areas:

Each median of a triangle divides the triangle into two regions with equal areas. The point where all three medians intersect is called the centroid, which is also the center of mass of the triangle.

2. Medians are Concurrent:

The three medians of a triangle are always concurrent, meaning they intersect at a single point called the centroid. This centroid divides each median in a 2:1 ratio, with the longer segment adjacent to the vertex.

3. Medians Divide the Triangle into Six Congruent Triangles:

The medians of a triangle divide the triangle into six smaller congruent triangles. Each of these triangles shares a common vertex with the original triangle.

4. Medians Determine the Centroid:

The centroid of a triangle is the point of intersection of the three medians. It is the balance point of the triangle, where the triangle would perfectly balance on a needle.

In summary, a median is a line segment connecting a vertex of a triangle to the midpoint of the opposite side. Medians have unique properties, including dividing the triangle into equal areas, being concurrent at the centroid, dividing the triangle into congruent triangles, and determining the balance point of the triangle.

for more such question on segment  visit

https://brainly.com/question/28322552

#SPJ8

Find the missing side.
N
41° 15
Z=
Round to the nearest tenth.
Remember: SOHCAHTOA

Answers

Answer:

To the nearest tenth, we have,

z = 19.9

Step-by-step explanation:

The missing side is the hypotenuse,

And we are given the side adjacent to the angle,

z = hupotenuse = H = ?

Adjacent = A = 15

Angle = α = 41

Since we have to find hypotenuse and we are given adjacent,

Using SOHCAHTOA,

We know the angle and adjcent but need to find Hypotenuse,

So, we use CAH

or,

cos(α) = A/H

cos(α) = 15/z

(since z = hypotenuse)

zcos(α) = A

z = A/(cos(α))

z = 15/cos(41)

z = 19.8752

To the nearest tenth, we get,

z = 19.9

The apparent midpoint of AB is –

Triangle ABC is placed on a grid as shown.

The apparent midpoint of AB is –

(1.5, 1.5)

(3, 3)

(4.5, 4.5)

(4.5, 1.5)

Answers

The apparent midpoint of AB is (3, 3) (option b).

To find the apparent midpoint of AB, we need to determine the coordinates that represent the midpoint of the line segment AB.

The given triangle ABC is placed on a grid. Since the coordinates are not provided for points A and B, we cannot directly calculate the midpoint using their coordinates. Therefore, we'll have to rely on the visual representation provided.

Looking at the grid, we can see that the line segment AB is a diagonal of the square formed by the grid lines. The square has sides of length 3 units, as it extends from (1, 1) to (4, 4).

The midpoint of a line segment is the point that divides the segment into two equal parts. Since the square has sides of length 3, the midpoint of AB should be at the halfway point between (1, 1) and (4, 4).

To calculate the coordinates of the midpoint, we take the average of the x-coordinates and the average of the y-coordinates.

The x-coordinate of the midpoint is (1 + 4) / 2 = 5 / 2 = 2.5.

The y-coordinate of the midpoint is (1 + 4) / 2 = 5 / 2 = 2.5.

Therefore, the apparent midpoint of AB is (2.5, 2.5).

However, none of the given options match the calculated midpoint. It's possible that there is an error or discrepancy in the given options. Based on the calculations, the correct apparent midpoint of AB should be (2.5, 2.5). Thus, the correct option is a.

For more such questions on midpoint, click on:

https://brainly.com/question/28443113

#SPJ8

100 Points! Geometry question. Photo attached. Please show as much work as possible. Thank you!

Answers

The probability is given as follows:

0.278 = 27.8%.

The event is not mutually exclusive, as the probability is different of zero.

How to calculate a probability?

The parameters that are needed to calculate a probability are listed as follows:

Number of desired outcomes in the context of a problem or experiment.Number of total outcomes in the context of a problem or experiment.

Then the probability is calculated as the division of the number of desired outcomes by the number of total outcomes.

The total number of outcomes when two dice are rolled is given as follows:

6² = 36.

The desired outcomes are given as follows:

Doubles: six, (1,1), (2,2), ..., (6,6).Sum of 6: four: (1,5), (2,4), (4,2) (5,1), as (3,3) is already counted as doubles.

Hence the probability is given as follows:

(6 + 4)/36 = 5/18 = 0.278 = 27.8%.

Learn more about the concept of probability at https://brainly.com/question/24756209

#SPJ1

Other Questions
Given the following Transfer Function H(s) = 1 / ((s+a)^2) what isthe phase in degreees at a frequency w = a rad/sec? which of the following features is unique to meiosis? analog conditions are used in a functional analysis because: Learning Task 1 dentify the acids and bases in each of the following reactions. 1. CN- + H2O = HCN + OH- 2. HNO2(aq) + H2O) = NO2-(aq) + H3O+(aq) 3. NH3(aq) + H2O(l) = NH4+ (aq) + OH (aq) 4. H2O + HCl = H3O+ + CH- 5. NH3 + HF = NH4+ + F *completing the tableRequired: 1. Calculate the total recorded cost of ending inventory before any adjustments. 2. Calculate ending inventory using the lower of cost and net realizable value. 3. Record any necessary adjus Find the measure (in degrees, not equal to the given measure) of the least positive angle that is coterminal with A. A=343 For the following equations find 1) the general form for all solutions 2) the solutions on the interval (pi/2) Write a program that achieves the concept of thread using extends of thread or implements runnable then achieve synchronize for one function What does overriding a method mean? O Implementing a method in a subclass with the same signature of the superclass. Implementing an instance method with the same name as a static method. Implementing a method with the same name but different parameters. O Implementing a method in an interface. Design the MEMORY and I/O Subsystem based on the given specification with complete solutions. A microcomputer system with a 16-bit address bus and an 8-bit data bus uses memory-mapped I/O. It has 8KB of ROM starting at address 1000H constructed using 2048x8 chips; 8KB of RAM ending at address 4FFFH constructed using 4096x4 chips; a bidirectional I/O device at address E000H with control signal R'/W. a) Draw the memory map of the Memory and I/O subsystem also indicating on how many chips have been used for the design. b) Draw the ROM design that has the following control signals Rich media are needed for all of the following EXCEPT ______.Group of answer choicestasks that involve coming to a shared meaningenhancing social presenceenhancing social cuescommunicating simple and routine messages All of the following are found to promote economic growth EXCEPT A enforcement of popperty rights. B high population growth. democracy D protection of patents and copyrights: What method did Cattell embrace that deals with large numbers of variables that are thought to reflect smaller number of underlying variables?A. Bayesian statisticsB. ThurstoneC. factor analysisD. Microsoft Excel I hope for a solution as soon as possibleWhat is the function of the following code? MOV AH,09 MOV DX, OFFSET DATA_ASC INT 21H a. display single character b. display address of DATA_ASCII c. read string d. display DATA_ASCII An 80-year-old woman has pain in the right upper quadrant of her abdomen and a yellow tinge to her skin. You should suspect dysfunction of the: Transducer is defined as a device that converts a signal from one form of energy to another form. a) Transducers systems are not perfect systems. There are a number of performance related parameters, called as sensor specifications. Explain in detail any two specifications of a sensor/transducer system. b) 'In thermistor sensors, resistance decreases in a very nonlinear manner with increase in temperature.' With proper justification write whether given statement is true or false. c) List any three temperature sensors used by us in/around our home/College with the details of the applications. Who determines what is ethical and what is not ethical in abusiness? How can an organization encourage an atmosphere whereemployees are comfortable confronting others about situations thatthey feel Elasticity of demand plays a crucial factor in the decision governments take in terms of its selection of goods and services on which to levy excise taxes. Propose the types of goods it would choose on which to levy excise taxes. Use examples to motivate your answer In August 2022, after the Russian-Ukrainian war and the problem of food supply, and the increasing importance of financing the agricultural sector and sources of food security (an offshoot of Bank of Palestine company - BOP) was looking to extend services to rural areas in Palestine by providing small loans (5000-50000) dollars to farmers. As we knew microloans have always been costly for financial institutions to offer to the unbanked (though important in development) but AGbank believed that fintech innovations such as using the internet to communicate with loan applicants and judge their credit worthiness would make the program benefit and sustainable . Students are asked : a. whether AGbank could operate the program at scale?b. Would its big data and technical analysis provide an accurate measure of credit risk for loans to small customers?c. Could AGbank rely on its new credit-scoring system to reduce operating costs to make the program sustainable?d. How the Bank can make the program sustainable You work for a company that makes cell phones and have been made project manager for the design of a new cell phone. Your supervisors have already scoped the project, so you have a list showing the work breakdown structure, and this includes major project activities. You must plan the project schedule and calculate project duration. Your boss wants the schedule on his desk tomorrow morning! You have been given the information in Exhibit 4.13. It includes all the activities required in the project and the duration of each activity. Also, dependencies between the activities have been identified. Remember that the preceding activity must be fully completed before work on the following activity can be started. Your project is divided into five major subprojects. Subproject "P" involves developing specifications for the new cell phone. Here, decisions related to such things as battery life, size of the phone, and features need to be made. These details are based on how a customer uses the cell phone. These user specifications are redefined in terms that have meaning to the subcontractors that will actually make the new cell phone in subproject "S" supplier specifications. These involve engineering details for how the product will perform The individual components that make up the product are the focus of subproject "D." Subproject "I" brings all the components together, and a working prototype is built and tested. Finally, in subproject "V," suppliers are selected and contracts are negotiated. Exhibit 4.13: Work Breakdown Structure and Activities for the Cell Phone Design Project DEPENDENCY DURATION (WEEKS) 6 4 P1 P2 5 4 P3 P4 6 6 P4 1 MAJOR SUBPROJECTS/ACTIVITIES ACTIVITY IDENTIFICATION Product Specifications (P) Market research P1 Overall product specifications P2 Hardware P3 Software P4 Supplier specifications (S) Hardware S1 Software S2 Product design (D) Battery D1 Display D2 Camera D3 Outer cover Product integration (I) Hardware 11 User interface 12 Software coding 13 Prototype testing 14 Subcontracting (V) Suppliers selection V1 Contract negotiation V2 S1 S1 S1 D1, D2, D3 2 1 4 D4 3 4 D4 D2 12 I1, I3 4 4 10 si ,S2 14, V1 a. Calculate the start and finish times for each activity. (Leave no cells blank - be certain to enter "O" wherever required.) Activity Earliest Start Time Earliest Finish Time Latest Start Time Latest Finish Time 6 P1 0 6 0 P2 6 10 13 x 17 x P3 10 15 17 x 22 x P4 15 19 22 x 26 X S1 19 25 26 x 32 x S2 25 X 31 x 30 x 36 x D1 31 x 32 x 34 x 35 x D2 32 X 34 x 32 x 34 X D3 34 x 35 X 34 x 35 X D4 35 X 39 X 35 X 39 x 11 39 x 42 x 39 x 42 x 12 34 x 38 x 34 x 38 x 13 38 xx 42 x 38 x 42 x 14 42 x 46 x 42 X 46 X V1 31 X 41 x 36 x 46 X V2 46 X 48 X 46 X 48 x b. Determine the minimum number of weeks for completing the project. Minimum number of weeks 48 c. Find the activities that are on the critical path for completing the project in the shortest time. P1-P2-P3-P4-S1-D2-D4-11-14-V2 O P1-P2-P3-P4-S1-D3-D4-11-14-V2 X P1-P2-P3-P4-S1-D2-12-13-14-12 P1-P2-P3-P4-S1-D1-D4-11-14-V2