Part of the processing requirement step include defining task that must be required in order for input data to be processed into output. Process requirements define guidelines and benchmarks for organizing and carrying out tasks (workflows, processes, procedures, tasks).
A corporate organization will develop procedures, processes, and strategies to be used in order to produce a specific outcome (product or service) that materializes or fulfills the first stated needs in process requirements. Stepping through a list of duties is necessary to determine the needs for a procedure.
Follow the link below to learn how a product is verified to determine whether it meets the requirements
https://brainly.com/question/24613576
When shortening an internet protocol (ip) v6 address, which two rules are used? check all that apply.
The two principles to follow when shortening an internet protocol (ip) v6 address are to replace groups of zeros with colons and eliminate all leading zeros.
Internet Protocol version 6 is the most recent iteration of the protocol that controls traffic on the Internet and acts as an identity and location system for devices on networks (IPv6).
In order to solve the long-anticipated issue of IPv4 address exhaustion and eventually replace IPv4, the Internet Engineering Task Force (IETF) developed IPv6. An further technological benefit of IPv6 is that it has a larger addressing space.
Learn more about IPv6 https://brainly.com/question/15733937
#SPJ4