To convert a Windows Server into a domain controller, there are two things that must be done. First, you need to install Active Directory Domain Services (AD DS). correct option is d (Active Directory Domain Services)
This can be done through Server Manager by selecting the option to add a role or feature and choosing Active Directory Domain Services (AD DS) from the list of available options. Once the installation is complete, you will need to configure the Active Directory database. This is the second thing that must be done. To do this, you need to execute the dcpromo command from Server Manager.
This will launch the Active Directory Domain Services Installation Wizard, which will guide you through the process of creating a writable domain controller. During the process, you will need to choose the appropriate options for your organization, such as the domain name, the administrator password, and the DNS configuration.
Once the wizard is complete, your Windows Server will be converted into a domain controller that can be used to manage your organization's network and security settings.
To know more about Windows Server visit:
https://brainly.com/question/9473585
#SPJ11
The maximum time allowed for the Sprint planning for a 2 week Sprint is_________.
The maximum time allowed for the Sprint planning for a 2 week Sprint can vary depending on the size and complexity of the project. However, the general recommendation is that the Sprint planning should not take more than 8 hours for a 2 week Sprint.
This allows the Scrum team to adequately plan and prioritize the work that needs to be done during the Sprint.During the Sprint planning, the Product Owner and the Development team work together to define the Sprint goal and identify the work that needs to be completed during the Sprint. The Product Owner presents the highest priority items from the product backlog and the Development team estimates the effort required to complete each item. Based on these estimates, the Development team commits to completing a certain amount of work during the Sprint.The time-box for the Sprint planning is typically set at 8 hours for a 2 week Sprint, but it is important to note that this time can be adjusted based on the needs of the team. If the team needs more time to adequately plan and prioritize the work, they can request additional time from the Scrum Master. However, it is important to ensure that the time-box is not extended excessively as it can lead to delays in the project and impact the team's ability to deliver the work within the Sprint.
To know more about Sprint visit:
brainly.com/question/14582692
#SPJ11
Prior to starting an engine, you should check the turn and slip indicator to determine if the
A. needle indication properly corresponds to the angle of the wings or rotors with the horizon
B. needle is approximately centered and the tube is full of liquid
C. ball will move freely from one end of the tube to the other when the aircraft is rocked
The correct answer is A, "needle indication properly corresponds to the angle of the wings or rotors with the horizon."
The turn and slip indicator is an instrument in an aircraft that shows the rate of turn and the coordination of turns. It has a needle that moves to the left or right to indicate the rate of turn, and a small ball in a curved glass tube that moves to the left or right to indicate the coordination of the turn.
Before starting an engine, it is important to check the turn and slip indicator to ensure that the needle indication properly corresponds to the angle of the wings or rotors with the horizon. This is because the indicator works based on a gyroscope that detects the aircraft's rate of turn and its position relative to the horizon.
If the instrument is not properly calibrated or if there is a malfunction, it can lead to incorrect readings and potentially dangerous flying conditions. Therefore, it is essential to check the turn and slip indicator as part of the pre-flight checklist to ensure that the instrument is working properly and that the aircraft is safe to fly.
To learn more about turn and slip indicator, click here: brainly.com/question/30773859
#SPJ11
a(n) ________ is a set of symbols that the sender transmits.
A(n) message is a set of symbols that the sender transmits. A message can be verbal or nonverbal, and it can be transmitted through various communication channels, such as face-to-face interaction, email, text message, or phone call.
The symbols in a message can include words, tone of voice, body language, facial expressions, images, and other visual aids. The sender encodes the message in a way that is intended to convey a specific meaning to the receiver. However, the receiver may decode the message differently based on their own experiences, attitudes, and biases.
Therefore, effective communication requires not only clear encoding but also accurate decoding and feedback. Miscommunication can occur when the sender and receiver have different assumptions or expectations about the meaning of the symbols used in the message. Effective communication involves being aware of these potential barriers and using strategies to overcome them.
To know more about sender transmits visit:
https://brainly.com/question/30020581
#SPJ11
Which of the following changes helped General electric improve product delivery from its circuit-breaker division?
A. developing individualized custom-designed products.
B. Introducing a more streamlined management system.
C. Consolidating manufacturing areas.
D. Instituting an automated design system
Answer:
The answer is D. Instituting an automated design system.
General Electric's circuit-breaker division was able to improve product delivery by instituting an automated design system. This system allowed engineers to design and test new products more quickly and efficiently. As a result, the division was able to bring new products to market faster and meet customer demand more effectively.
The other options are not correct because they do not directly address the issue of product delivery. Developing individualized custom-designed products may increase customer satisfaction, but it will not necessarily improve product delivery. Introducing a more streamlined management system may improve efficiency, but it will not necessarily improve product delivery. Consolidating manufacturing areas may reduce costs, but it will not necessarily improve product delivery.
Explanation:
the coolest place in a steam sterilizer is
The coolest place in a steam sterilizer is usually at the bottom of the chamber.
During a steam sterilization cycle, the heat source is typically located at the top of the chamber, which causes the steam to initially flow upward. As the steam condenses and loses heat, it begins to sink and circulate throughout the chamber. This creates a temperature gradient with the hottest temperatures at the top and the coolest temperatures at the bottom. In addition, any cool air that is present in the chamber will also sink to the bottom. Therefore, it is important to ensure that items being sterilized are properly loaded and positioned to ensure adequate steam and heat penetration throughout the entire load.
Learn more about condenses here: brainly.com/question/32139648
#SPJ11