Why is Earned Value a very powerful tool? Answer: It combines the cost, scope, and ____________ as an integrated tool to calculate project performance. It also allows us to do _______________ under different estimating assumptions as discussed earlier.

Answers

Answer 1
Answers
1) Time
2) cost analysis or performance measurement.

Explanation


Earned value — it integrates cost, time and the work done (or scope) and can be used to forecast future performance and project completion dates and costs...

Related Questions

First answer, I’ll mark the brainliest .

Answers

The answer to the question is b
The answer is b hope this helps

if the demand for a good increases by more than the supply of the good increases, then the goods equilibrium price will ________ and its equilibrium quantity will __________. group of answer choices

Search Results
Web results

Answers

Answer: Equilibrium price will increase and its equilibrium quantity remains the same

True or False: Cell phone chargers are considered hazmat products and cannot be stowed with items like books
or towels

Answers

Answer:

I would say false

Explanation:

the charger is like an appliance . if it isn't in use it's harmless . I don't know for sure.

Answer:

The statement "Cell phone chargers are to be considered as the hazmat products and they cannot be stowed the items such as books or towels" is false.

Explanation:

Hazmat products are those products that are considered to be hazardous that could risk:

Health, Property, Or the Environment.

It could become hazardous at the time:

Storing, Handling, Or Transporting them.

As they consist of flammable, pressurized. It includes such substances as fuels, nuclear waste products, etc.

Also, it can be stowed with items such as books or towels.

Therefore we can conclude that the statement "Cell phone chargers are to be considered as the hazmat products and they cannot be stowed the items such as books or towels" is false.

Learn more about hazmat products here: brainly.com/question/24142576

In the accounting equation, assets are equal to liabilities plus what?
A Owner equity
B Revenue
C. Accounts
D. Interest
Please select the best answer from the choices provided
A
B
O O O
С
D

Answers

Answer:

A. Owners equity

Explanation:

In a balance sheet, the accounting equation reflects a scenario in which assets are equal to liabilities including owners equity. This is premised on the principle of double entry which is the foundation of accounting.

Owners equity is the amount owned by the business owner or his investment in the business less drawings.eg retained earnings,profits, etc.

The reason for accounting equation is to show that the balance sheet tallies such that items on the debit matches items on the credit

Which occupation in the architecture and construction industries is expected to have a slower than average job growth? carpenters engineers boilermakers brick masons

Answers

Answer:

Boilermakers

Explanation:

Boilermaker are individuals who are into making boilers or large containers that is meant for housing or keeping liquid or gases such as oil or gas. They are involved in fabrication of steel, iron or copper into boilers. There job roles can involves repairs as well.

However, according to Bureau of Labor Statistics, the job growth of Boilermaker is 6%, and with the closure of most Coal Fired power plants in the coming decade, there is going to be lesser demands for boilermaker.

Specifically in building construction, gas boilers are expected to be replaced by low carbon heating system in all new homes, in the near future, this will gradually reduce demand for boilermakers.

Also, considering the increase in energy sector, trying to move away from crude oil to renewable energy such as solar, there will be lesser demand for boilermaker.

In 1-3 sentences, explain the role of entrepreneurs in the economy.

Answers

Answer: Entrepreneurs are people who usually travel around the world

Explanation:

The invention of photography was initially important because:
A. it provided fun and entertainment for thousands of people.
B. it enabled people to communicate more information faster.
C. it gave farmers a means of keeping track of farm goods and
equipment
D. it helped artists, scientists, and journalists communicate in a new
way.

Answers

Answer:

D. it helped artists, scientists, and journalists communicate in a new  way.

Explanation:

The invention of photography helped in preserving the images and storing them for the future. Photography helped in the creation of a new medium of communication. The movement led towards the development in the field of history, science, art, and industry. The information can be archived and stored. Also, photography led to the new way of perceiving things from the eyes of the photographer and the journalists. It gave a new outlook to the artists to present their art forms.

In your opinion, what are tradeoffs of a very successful biking company in a community?

Answers

Answer:

A snowboard, or an electric scooter

Explanation:

This two products may be bought by a buyer because they are less expensive or maybe even more convenient and safer than a bike from a popular manufacturer like Giant.

The actual purchase decision for an electric scooter or snowboard signifies the trade-off over the bike.

Food Safety - Potential Hazards (CORE)
<
To help prevent chemical contamination, where should you store chemicals?
O Below food storage areas
In the bathroom
O Above food storage areas
O Away from food

Answers

Answer:

Away from food

Explanation:

Chemicals should be stored away from food because the slightest contact between them would lead to chemical contamination

2 features of public limited companies

Answers

Led by Board of Directors and life span




Hope this helped!

I WILL MARK THE BRAINLIEST HELP ME PLEASE

Answers

Answer:

It's D im guessing

Explanation:

It Should be letter D

Which of the following best explains how a recovery period leads to a boom?

A. A natural disaster resulting in greater demand for housing
construction.

B. A decrease in unemployment resulting from low production costs.

C. An increase in consumer demand resulting from a reduction in prices.

D. A reduction in consumer demand resulting from hyperinflation.

The answer is C. An increase in consumer demand resulting from a reduction in prices.​

Answers

Answer:

C. An increase in consumer demand resulting from a reduction in prices .

Explanation:

when prices decline the consumer demand quantity increases.

Answer:

an increase  in consumer  demand result from a reduction in prices

Explanation:

Which of the following would cause the supply curve to shift to the right?
technology improves production
The government increases taxes on a business
Input prices for a business become more expensive
the number of consumers decline

Answers

Answer:

Technology improves production.

Explanation:

Supply refers to the quantity of goods and services produced and offered to the market for sale.

There are several factors that could cause the supply curve to shift to the right, one of which is technology improves production. An improvement in technology will phase out manual or slow process of production hence shifts supply curve to the right.

When government increases tax on a business, if will affect the income that should have accrued to the business hence supply curve inward. An increase in input prices will affect production cost thereby shifting supply to the left. Also when there is a decline in the numbers of consumers, it will shift supply curve inward because it is these consumers that will purchase whatever that is produced and supplied to the market.

Drag each tile to the correct box.

Match each investment example to the type of risk involved with it.

credit risk
inflationary risk
market risk
reinvestment risk
George purchased a US Treasury bond that matures in five years. He plans to purchase a newly issued Treasury bond and hopes it will be just as valuable.
arrowRight
Claretta purchased a Treasury bond that pays 1% interest when the price of goods and services are rising by 2%.
arrowRight
Corbin purchased a corporate bond with a poor rating and a risk of default.
arrowRight
Beth bought a company’s stock in hopes of a quick profit, but the stock price has been very unpredictable.
arrowRight

Answers

Answer:

Reinvestment risk ⟶ George purchased a US Treasury bond that matures in five years. He plans to purchase a newly issued Treasury bond and hopes it will be just as valuable.Inflationary risk ⟶ Claretta purchased a Treasury bond that pays 1% interest when the price of goods and services are rising by 2%.Credit risk ⟶ Corbin purchased a corporate bond with a poor rating and a risk of default.Market risk ⟶ Beth bought a company’s stock in hopes of a quick profit, but the stock price has been very unpredictable.

Explanation:

Let's review the first scenario. We know that George just bought a bond that will mature in five years. If the bond turns out to be profitable, he intends to buy a new US Treasury bond once his current one matures. This accurately describes a reinvestment risk because he is risking buying a second bond based on the outcome of the first one. Once the bond matures, the interest rates will have fallen, which will make it extremely less likely that newer bonds available to reinvest in will offer the same rewards.Now take a look at the scenario. This one is relatively obvious. Since it states that the prices of goods and services are rising, Claretta's interest won't seem like much after a few years. This makes it an inflationary risk because the inflation rates in her country are rising and her interest returned will buy her less that it would have in the past.Moving onto the third scenario, we can see that Corbin purchased a bond from a corporation that has incredibly low ratings and usually fails to repay their loans. This indicates a credit risk. A credit risk occurs when  an investor chooses to invest in a bond issuer that has a history of poor credit reliability. This is clearly the case for this issue and therefore, Corbin has made a credit risk.The final scenario indicates a market risk. A market risk is any factor that affects the overall performance of the financial markets. Since the stock prices in Beth's economy have been unpredictable, clearly something has negatively impacted the market so the stock prices are frequently fluctuating.

Answer:

Reinvestment risk ⟶ George purchased a US Treasury bond that matures in five years. He plans to purchase a newly issued Treasury bond and hopes it will be just as valuable.

Inflationary risk ⟶ Claretta purchased a Treasury bond that pays 1% interest when the price of goods and services are rising by 2%.

Credit risk ⟶ Corbin purchased a corporate bond with a poor rating and a risk of default.

Market risk ⟶ Beth bought a company’s stock in hopes of a quick profit, but the stock price has been very unpredictable.

Explanation:

Other Questions
CAN 10/12 BE REPLACED WITH 1/2 WHILE ESTIMATING? YES OR NOCAN 7/16 BE REPLACED WITH 1/2 WHILE ESTIMATING? YES OR NOCAN 2/9 BE REPLACED WITH 1/2 WHILE ESTIMATING? YES OR NOCAN 1/8 BE REPLACED WITH 1/2 WHILE ESTIMATING? YES OR NO How many grams of aluminum oxide would be produced from the reaction of 0.25 grams of aluminum with excess oxygen gas? Suppose you are provided with the following data for your country for a particular month: 200 million people are working, 20 million are not working but are looking for work, and 40 million are not working and have given up looking for work. If we treated discouraged workers as unemployed, what would the unemployment rate for that month be SOLVE FOR 20 pls hurry Simplify expression. Use the distributive property. :)14-2(4x+3y) Transformational leadership Group of answer choices Helps followers to transcend their own self-interest for the good of the group Is a process in which leaders and followers exchange effort for specified rewards Is an interactive process in which the leader tries to shift power to those who are being led Female honey bees are diploid and male honey bees are haploid. The haploid males produce sperm and can successfully mate with diploid females. Fertilized eggs develop into females and unfertilized eggs develop into males. How does the process of sperm production in male honey bees differ from sperm production in other animals? a. Male honey bees use meiosis I only, whereas other animals use both phases of meiosis. b. Male honey bees use meiosis, whereas other animals use mitosis. c. Male honey bees use mitosis, whereas other animals use meiosis. d. Male honey bees can use mitosis or meiosis, whereas other animals can only use meiosis. If 3 boxes of apples weigh 105 pounds, how much would 2 boxes of apples weigh? To show situations in which something might happen, use the Two bumper cars collide and then move away from each other. The forces exerted are:A. Equal and opposite B. Opposite C. Equal If you wanted to perform a controlled experiment to test the effect of temperature on the pressure of a bicycle tire, which of the following would be necessary? Whats 30x8+5 divided by 8% = PointsWhat opportunities existed for sharecroppers who made money in a growingseason?A. They could rent more land.B. They could find another landowner to sharecrop for.C. They could look for work in a town.D. All of the above how does Roosevelt's use of the big stick metaphor in the paragraph on pages 5-6 impact his speech solve ab-(ab) if a=-2 and b=3 I need helpOn these two PLEASE HELP ANSWER WILL GET BRAINLIEST!! What is the value of x in the equation Find the term that must be added to the equation x22x=3 to make it into a perfect square. A. 1 B. 4 C. -3 D. 2 What is 540 to the nearest TENTH? What is (n^2)(n^3)^-2?