Write down a work breakdown structure for the task of building a snowman. Assume that you have a team of two, and indicate which activities can be done in parallel. Write a separate list of the tools and parts required.

Answers

Answer 1

1. Gather materials:
  - Snow (enough to form the body, head, and accessories)
  - Carrot (for the nose)
  - Coal or stones (for the eyes, mouth, and buttons)

2. Divide and conquer: Since you have a team of two, you can split the tasks and work in parallel.
 Team Member 1:
  - Build the snowman's body: Roll a large snowball on the ground to form the base.
  - Build the snowman's head: Roll a smaller snowball and place it on top of the body.
  - Attach the carrot nose and coal/stones for eyes, mouth, and buttons.

3. Final touches:
  - Smooth out any rough edges on the snowman's body and head.
  - Adjust the position of the arms, eyes, mouth, and buttons.
Remember to have fun and be creative while building your snowman. Feel free to add any additional accessories or decorations to make it unique and personal.
To know more about materials visit:

https://brainly.com/question/30503992

#SPJ11


Related Questions

Please explain the benefits of the script and technical
brief on what the script does!!! thank you!!!!
#!/usr/bin/python3
'''
Exploit for CVE-2021-3156 with overwrite struct service_user by
sleepya
Th

Answers

The script is an exploit written in Python for CVE-2021-3156, which refers to a specific vulnerability in the sudo command on Linux systems.

This vulnerability, also known as "Baron Samedit," allows unauthorized users to gain root-level privileges on the system. The script specifically targets the overwrite of the struct service_user by an individual named sleepya.

The script takes advantage of a buffer overflow vulnerability in the sudo command's sudoedit feature. By exploiting this vulnerability, the script allows an attacker to bypass security measures and escalate their privileges to root, gaining full control over the system.

The benefits of this script lie in its ability to exploit a critical vulnerability in the sudo command, which is commonly used for granting administrative privileges. By successfully executing this script, an attacker can gain elevated privileges on the targeted system, enabling them to perform malicious activities or access sensitive information.

It is important to note that this script is designed for educational and informational purposes only. It should not be used for any malicious intent or unauthorized activities. Exploiting vulnerabilities without proper authorization is illegal and unethical. Organizations and system administrators should promptly patch and update their systems to protect against CVE-2021-3156 and other known vulnerabilities.

Learn more about Python here:

brainly.com/question/30427047

#SPJ11

1.
whats the nomalization?
2. how would you describe a condition in which one attribute
is dependent on another attribute when neither attribute is part of
the primary key?

Answers

Normalization is the process of organizing data into well-structured tables to eliminate redundancy and improve data integrity. It involves breaking down larger tables and establishing relationships between them, reducing anomalies and inconsistencies.

Normalization is a crucial step in database design to ensure efficient and reliable data management. It involves dividing a large table into smaller, more manageable tables that adhere to certain rules or normal forms. By doing so, redundancy and data anomalies can be minimized.

In the given scenario where one attribute depends on another attribute, but neither attribute is part of the primary key, it signifies a functional dependency. This means that the value of one attribute determines the value of another attribute within the table. While primary keys uniquely identify rows, functional dependencies help maintain data consistency.

By properly identifying and representing these dependencies, database designers can ensure that data remains accurate and reliable. Normalization enables the creation of well-structured tables with appropriate relationships, reducing data redundancy and improving overall data integrity. This, in turn, facilitates efficient data management and enhances the performance of database systems.

Learn more about Normalization here:

https://brainly.com/question/31032078

#SPJ11

Part 4 - A function to calculate the differences between array items have one item iess thon the input. You must write your function using cither bosic array manipulation or for/while loops - you may

Answers

Here's an example of a Python function that calculates the differences between array items, resulting in an array with one item less than the input array. This function uses basic array manipulation:

python

def calculate_differences(arr):

   differences = []

   for i in range(len(arr)-1):

       differences.append(arr[i+1] - arr[i])

   return differences

To calculate the differences between array items, with one item less than the input, we can define a function called `calculate_differences()` in Python. This function takes an array as input and uses a for loop to iterate over the elements of the array.

Inside the loop, we access each element of the array using its index `i`. By subtracting the current element (`arr[i]`) from the next element (`arr[i+1]`), we can calculate the difference between these two adjacent items. The differences are then stored in a new array called `differences`.

The loop iterates up to `len(arr)-1` to ensure that we stop at the second-to-last element, as we need to compare it with the last element. By subtracting each element from its succeeding element, we calculate the differences between consecutive items in the array.

Finally, the function returns the `differences` array, which contains the calculated differences between the array items.

Learn more about Python function

brainly.com/question/30763392

#SPJ11

Practical 3 [17] Design a digital bandstop Butterworth filter using the bilinear transformation with prewarping to satisfy the following specifications: , --1 dB, G, -22 dB, 0, -40 rad /s, 00, -195 rad/s and 0-80 rad / s, (0, -120 rad/s. The highest significant frequency is 200Hz Demonstrate with aid of the following input signal 1 x(1)-1+ sin (10x)+sin (2001)+ sin (400xr). T. -- sec 1500 that your Matlab implementation is working. NB: Practical 3 is marked according to the rubric below. Beware. Practical 3.2: [17] Design: [[8] Are design calculations accurate? Implementation: [[6] Plot of frequency responses. (this also include Matlab script) Testing: /[3] Do the responses reflect design specification? (this also include Matlab script)

Answers

The filter command in MATLAB to filter the input signal, providing the numerator and denominator coefficients of the transfer function.

Step 1: Normalize the frequency range

- The given frequency ranges are 0-40 rad/s, 0-195 rad/s, and 0-120 rad/s, which correspond to normalized frequencies of 0-0.2π, 0-0.975π, and 0-0.6π, respectively, for a sampling frequency of 2π radians/second.

Step 2: Find the analog bandstop filter transfer function

- Convert the high and low stopband frequencies to the analog domain using the formulae: ωaL = tan(ωdL/2), ωaH = tan(ωdH/2).

- Find the cutoff frequency of the lowpass filter using the formula: ωc = √(ωaL.ωaH).

Step 3: Find the digital filter transfer function

- Use the bilinear transformation to convert the analog filter transfer function to the digital domain.

- Prewarp the resulting transfer function to correct for frequency warping: Hd(z) = Hs(s)|s=jw/(1+(w/wo)^2), where wo is the prewarping frequency.

Step 4: Implement the filter in MATLAB and test it

- Calculate the analog filter transfer function H(s).

- Calculate the digital filter transfer function Hd(z).

Plot the output signal using the plot command. Plot the frequency response of the filter using the freqz command to ensure it matches the design specifications.

To know more about frequency visit:

https://brainly.com/question/29739263

#SPJ11

Examples of Point to Point communication include:
A Bluetooth, mandated by protocol
B USB, mandated by physical connections
C Both a and b
D None of the above

Answers

Point-to-Point Communication refers to the communication between two individual devices. Here, the communication happens between a single sender and a single receiver.

Point-to-Point communication can happen through various channels. The different examples of Point-to-Point communication include:Bluetooth, mandated by protocol. Bluetooth is an example of a point-to-point wireless protocol used for communication between two devices.

This technology is used for transmitting data over short distances between various devices. This technology is widely used in wireless headsets, computer mouse, keyboards, mobile phones, and more.USB, mandated by physical connections. The USB (Universal Serial Bus) is a physical standard used for connecting a wide range of devices such as smartphones, printers, cameras, and more.

To know more about individual visit:

https://brainly.com/question/32647607

#SPJ11

You need to ensure that Active Directory domain user Alice does not have read access to the folder named Graphics. The Graphics folder is shared to the network from the server named FS0. The disk partition on which Graphics is located is formatted as NTFS. What should you do?

Answers

To ensure that Active Directory domain user Alice does not have read access to the folder named Graphics, you need to modify the folder permissions on the NTFS partition.

The Graphics folder is shared to the network from the server named FS0. Here's what you should do:Locate the Graphics folder and right-click it, then click Properties.In the Properties dialog box, click the Security tab, then click Edit.

In the Permissions dialog box, click Add.In the Enter the object names to select box, type Alice, then click OK.In the Permissions for Alice section, select the Read checkbox and click the Deny checkbox.Click OK, then click OK again on the Security tab of the Graphics Properties dialog box.After performing these steps, Alice will not have access to the Graphics folder.

To know more about Active Directory visit:

https://brainly.com/question/31766282

#SPJ11

Work with the Iris Flower classification system by downloading
the data and classifying new flowers.
Dataset – Solutions --

Answers

The Iris Flower classification system involves working with a dataset containing information about different Iris flowers and their corresponding species. By downloading the dataset and applying classification techniques, it is possible to classify new flowers based on their characteristics.

The Iris Flower dataset is a popular dataset in the field of machine learning and is often used for classification tasks. It consists of measurements of four features: sepal length, sepal width, petal length, and petal width, along with the corresponding species of the Iris flower (setosa, versicolor, or virginica). The goal is to build a classification model that can accurately predict the species of an Iris flower based on its feature measurements.

To classify new flowers using this dataset, various machine learning algorithms can be employed, such as decision trees, support vector machines, or neural networks. The first step is to preprocess the data, which may involve cleaning the dataset, handling missing values, and normalizing or standardizing the feature values. Next, the dataset is typically split into training and testing sets, with the training set used to train the classification model and the testing set used to evaluate its performance.

During the training phase, the chosen algorithm learns the patterns and relationships between the input features and the corresponding species labels. Once the model is trained, it can be used to classify new flowers by inputting their feature measurements and obtaining predictions for their species. The accuracy of the classification can be assessed by comparing the predicted labels with the actual labels of the new flowers.

By working with the Iris Flower dataset and employing suitable classification techniques, it is possible to build a model that can classify new flowers accurately based on their measurements. This allows for the automation of flower classification and can have various applications in fields such as botany, agriculture, and ecology.

Learn more about Iris Flower here:

brainly.com/question/33347591

#SPJ11

In an activity network, an activity cannot begin until at least one of the preceding connected activities has completed .
True
False
The critical path through an activity network is the shortest path through the activity network from start to finish.
True
False
Operational definitions are the rules and procedures used to capture and record data - what to include and exclude from the data.
True
False
Conditional statements are allowed in project networks.
True
False
How is the Schedule Variance (SV) calculated in earned value management?
EV / PV
PV - AC
EV / AC
AC - PV
AC / PV
PV / AC
EV - AC
EV - PV
A burst activity in a project network has more than one activity immediately preceding it.
True
False
Boehm identifies goldplating as one of the top 10 software risks.
True
False

Answers

1. True: In an activity network, an activity cannot begin until at least one of the preceding connected activities has completed.

2. True: The critical path through an activity network is the shortest path from start to finish.

3. True: Operational definitions are the rules and procedures used to capture and record data, specifying what to include and exclude from the data.

4. True: Conditional statements are allowed in project networks.

5. SV is calculated as EV - PV in earned value management.

6. True: A burst activity in a project network has more than one activity immediately preceding it.

7. False: Boehm does not identify goldplating as one of the top 10 software risks.

1. In an activity network, dependencies are established between activities, and an activity can only start when its preceding connected activities have been completed. This ensures proper sequencing and dependency management within the network.

2. The critical path in an activity network refers to the sequence of activities that takes the longest time to complete, determining the minimum project duration. It represents the path with the least amount of slack or float, as any delay in activities on the critical path would result in project delay.

3. Operational definitions provide clear guidelines on what data to include and exclude when capturing and recording information. They establish the rules and procedures for data collection, ensuring consistency and accuracy in data analysis and reporting.

4. Conditional statements are allowed in project networks to handle different scenarios or decision points within the project. These statements enable the network to adapt based on specific conditions or dependencies, allowing for flexibility in project planning and execution.

5. Schedule Variance (SV) in earned value management is calculated by subtracting the actual cost (AC) from the earned value (EV). SV measures the deviation of the project's progress from the planned schedule. A positive SV indicates that the project is ahead of schedule, while a negative SV indicates a delay.

6. A burst activity in a project network refers to an activity that has more than one activity immediately preceding it. This means that multiple activities need to be completed before the burst activity can begin, highlighting complex dependencies and interrelationships within the network.

7. False: Goldplating, which refers to exceeding project requirements or adding unnecessary features, is not identified as one of the top 10 software risks by Boehm, who is known for his contributions to software engineering and project management.

To know more about activity network here: brainly.com/question/31252635

#SPJ11

Need help please. In python
Write a program that prompts the user to enter some text. You can assume that this text will consist of one or more words, where every word consists only of alphabetical characters and each word is se

Answers

The program prompts the user to enter some text and prints the number of words in the text.

Program to prompt user to enter some text in Python:

Here is the program to prompt a user to enter some text in Python. Please find the solution below:

def main(): user_input = input("Enter some text: ") words = user_input.split() word_count = len(words) print(f"Number of words: {word_count}")if __name__ == '__main__': main()

Explanation: We first define the function 'main()'. Then, we prompt the user to enter some text using the 'input()' function. We split the text into words using the 'split()' function and store the words in a list.

Next, we count the number of words using the 'len()' function and store the result in the 'word_count' variable. Finally, we print the number of words using the 'print()' function and f-strings. The 'if __name__ == '__main__'' block is used to check whether the program is run as the main program or imported as a module. If it is run as the main program, then the 'main()' function is called to start the program.

Conclusion: Thus, the program prompts the user to enter some text and prints the number of words in the text.

To know more about program visit

https://brainly.com/question/3224396

#SPJ11

1. Identify and Create a facility building schematic that has a
Server Room (15 points):
(a) Identify the purpose of the facility, numbers of people that
may be on-site at operational times, and acces

Answers

"Schematic" refers to a diagram or representation that outlines the structure, components, or connections of a system or process. To create a facility building schematic with a server room, the following steps can be taken:

(a) Identify the purpose of the facility, the number of people that may be on-site at operational times, and access. The purpose of the facility is to house a server room to accommodate the IT infrastructure of the organization. The facility will serve as a data centre to ensure the secure storage, processing, and distribution of the organization's digital information.

(b) Determine the size and location of the server room. The size of the server room will be determined by the number of servers and other IT infrastructure components that need to be housed in the facility. The location of the server room will be selected to ensure that it is away from any potential hazards, such as water sources or areas with high electromagnetic interference. The server room will also be located close to the main entrance of the facility to facilitate easy access for IT personnel.

(c) Create a schematic design of the facility building. The schematic design will include the location and size of the server room, as well as other essential components, such as the backup generator, cooling system, and other IT infrastructure components. The server room will be located at the centre of the facility to ensure that it is protected from external hazards and has easy access to other essential components.

To know more about Schematic visit:

https://brainly.com/question/14323677

#SPJ11


Learning Curve help, please!!!!
SHEALY TABLES Shealy runs a small business in upstate South Carolina in which he builds kitchen tables. He has recently designed a new table with many intricate carvings. Because Shealy has never done

Answers

Shealy Tables is a small business in upstate South Carolina that specializes in building kitchen tables. Shealy has recently designed a new table with intricate carvings.


The learning curve shows the relationship between the time it takes to complete a task and the number of times the task is performed. It suggests that as Shealy builds more of these tables, his efficiency and speed will increase, resulting in a shorter time to complete each table.


For example, if it takes Shealy 10 hours to build the first table, the learning curve predicts that it might take him 8 hours to build the second table, 6 hours for the third table, and so on. This means that with each table he builds, Shealy becomes more familiar with the process and can work more efficiently.

To know more about tables visit:

https://brainly.com/question/30855675

#SPJ11

1. The practice of sending brief posts (140 to 200 characters) to a personal blog, either publicly or to a private group of subscribers who can read the posts as IMs or as text messages is called?

2. Personal Web sites to share activities and opinions is called?

Answers

The term is microblogging. The term is personal blogs or personal weblogs.

What is the term for sending brief posts to a personal blog that can be read as IMs or text messages?

1. The practice of sending brief posts (140 to 200 characters) to a personal blog, either publicly or to a private group of subscribers who can read the posts as IMs or as text messages is called microblogging.

2. Personal websites created to share activities and opinions are commonly referred to as personal blogs or personal weblogs. They provide individuals with a platform to express their thoughts, interests, and experiences through written content, images, videos, or other multimedia formats.

These websites often serve as a means of self-expression, allowing individuals to showcase their creativity, share insights, and engage with a community of readers who have similar interests.

Personal blogs can cover a wide range of topics, including hobbies, travel, lifestyle, technology, fashion, or any other subject that the individual is passionate about. They provide a way for individuals to communicate their perspectives and connect with others who share their passions or viewpoints.

Learn more about blogs

brainly.com/question/32804941

#SPJ11

Consider the relation R(SenderID, SenderName, ReceiverID, Receiver Name, External, Message, Hash) with the following functional dependencies: SenderID → SenderName ReceiverID + Receiver Name Senderid ReceiverID + External Message + Hash SenderID ReceiverID Hash → Message (a) List all keys of R and argue why there can be no other keys. (b) Analyze whether R is BCNF. If it is, show that there are no BCNF violations. If it is not, show that there is at least one BCNF violation and decompose R until it is in BCNF. (c) What would change if we would consider 3NF instead of BCNF? Explain your answer.

Answers

(a) Keys of R: {SenderID, ReceiverID}

(b) R is in BCNF with no violations.

(c) Considering 3NF instead of BCNF does not introduce any changes in this scenario.

(a) To find the keys of relation R, we need to identify the attributes that determine all other attributes in the relation. From the given functional dependencies, we can see that SenderID and ReceiverID are both keys of R.

This is because SenderID determines SenderName and ReceiverID determines ReceiverName. Additionally, the combination of SenderID, ReceiverID, and Hash determines Message. Therefore, the keys of R are {SenderID, ReceiverID}.

(b) To determine if R is in BCNF, we need to check if all the functional dependencies in R are in BCNF.

In BCNF, every functional dependency must be either a trivial dependency (where the determinant is a superkey) or a non-trivial dependency (where the determinant is a proper subset of a superkey). Looking at the given functional dependencies, we can observe that they are all in BCNF. Hence, there are no BCNF violations in R.

(c) If we were to consider 3NF instead of BCNF, it would require analyzing whether there are any transitive dependencies present in the relation.

Transitive dependencies occur when there is a functional dependency between non-key attributes. In the given functional dependencies, there are no transitive dependencies since the dependencies involve only key attributes and Hash determines Message. Therefore, considering 3NF instead of BCNF would not result in any changes in this scenario.

In conclusion, the keys of relation R are {SenderID, ReceiverID}, and R is in BCNF with no violations. Considering 3NF instead of BCNF does not introduce any changes since there are no transitive dependencies to be addressed.

Learn more about BCNF here:

https://brainly.com/question/30167699

#SPJ11

Problem Description You are given an integer larray \( A \) and an integer B. You need to divide the array into B subarrays is each olement should belong to exactiy 1 subirify. The strangeness of \( A

Answers

We can divide the array A into B subarrays such that the strangeness of the array A will be minimized.

In this problem, we have used binary search for finding the minimum strangeness of the array A.

The time complexity of this algorithm will be O(nlog(sum of A)).

Given an integer array A and an integer B.

You need to divide the array into B subarrays such that each element should belong to exactly 1 subarray.

The strangeness of A is defined as the maximum value of the sum of subarrays after dividing the array into B subarrays.

Explanation:

The problem statement is quite simple.

Given an array A, we need to divide it into B subarrays. In such a way that each element of the array should belong to exactly one subarray.

The strangeness of the array is defined as the maximum value of the sum of subarrays after dividing the array into B subarrays.

Let us suppose, we have an array A and B subarrays of the array A are {A1, A2, A3,.... AB}.

Then, the strangeness of the array can be calculated by taking the maximum of the sum of each subarray.

Mathematically, the strangeness can be given as:

S= max(sum(A1), sum(A2), sum(A3),...,sum(AB))

We need to calculate the minimum value of the strangeness of the array A.

After dividing the array A into B subarrays.

Here is a complete algorithm for the above problem:

Algorithm:

1. Input the array A and an integer B.

2. Set low= maximum element of A, high= sum of A

3. Repeat steps 4 to 8 until low>= high.

4. Set mid= (low+high)/2.

5. Check if it is possible to divide A into B subarrays such that the maximum sum of any subarray is less than or equal to mid.

6. If yes, set high= mid-17.

    If no, set low= mid+18.

Return the value of low as the minimum value of strangeness of the array

To know more about algorithm, visit:

brainly.com/question/33344655

#SPJ11

write a well-known test program composed of two words

Answers

A well-known test program composed of two words is 'Hello World'.

A well-known test program composed of two words is 'Hello World'.

The 'Hello World' program is a simple program that is often used to introduce beginners to programming. It typically prints the phrase 'Hello, World!' to the screen. The purpose of the 'Hello World' program is to demonstrate the basic syntax and structure of a programming language and to ensure that the development environment is set up correctly.

The 'Hello World' program is commonly used as a first program in many programming languages, including C, C++, Java, Python, and more. It serves as a starting point for learning the fundamentals of programming and allows beginners to get familiar with the basic concepts of writing and running code.

Learn more:

About well-known test program here:

https://brainly.com/question/22018418

#SPJ11

One well-known test program composed of two words is "Hello World." This program is often used as an introductory program for learning how to code. It is a simple program that prints the phrase "Hello, World!" to the screen.

The purpose of the Hello World program is to demonstrate how to print text to the screen. It is a common first program for beginners learning any programming language because it is relatively simple and easy to understand. Once a programmer understands how to print text to the screen, they can move on to more complex programming concepts like variables, loops, and functions.

The Hello World program can be written in almost any programming language. Each language has its own syntax and way of printing text to the screen, but the overall concept is the same. The program is also useful for testing the programming environment and making sure that everything is set up correctly. Overall, the Hello World program is a great starting point for learning how to code.

You can learn more about the program at: brainly.com/question/30613605

#SPJ11

Which of the following technologies can prevent a department's network broadcast from propagating to another department's network if they are located on the same switch?
O Hub
O Firewall
O Trunk
O VLAN

Answers

VLAN (Virtual Local Area Network).

What technology can be used to isolate network broadcasts between different departments located on the same switch?

The technology that can prevent a department's network broadcast from propagating to another department's network if they are located on the same switch is:

O VLAN (Virtual Local Area Network).

VLANs provide logical segmentation within a physical network switch, allowing different departments or groups to be isolated from each other. By separating the networks into different VLANs, broadcasts are contained within their respective VLANs and do not propagate to other VLANs, ensuring network isolation and security.

Learn more about technology

brainly.com/question/9171028

#SPJ11

I need the answer with only 3 jobs(A,B,C) no D this
program is different it not like the other posts please and please
I need the program written as its listed in the
description. thanks
The program simulates a computer with multiple processors by using a queue. The goal is to determine how many processors should be used to process jobs most efficiently The jobs to be processed will b

Answers

The given program simulates a computer with multiple processors by using a queue. The purpose is to identify how many processors should be used to process jobs most effectively. The jobs to be processed are listed below along with the characteristics of the three jobs.Job A takes 3 seconds and appears every 10 seconds.Job B takes 4 seconds and appears every 8 seconds.Job C takes 6 seconds and appears every 14 seconds.

A queue will hold the jobs, and each processor can only handle one job at a time. The program should calculate the number of processors to use to minimize the average waiting time for jobs to be processed.Program:We define the time to process a job (i) as Ti where i ∈ [A,B,C]. Ti will be determined using the formulas:T=3T=4T=6The formula for the time for the next occurrence of a job (i) is ri where i ∈ [A,B,C].

ri will be determined using the formulas:r=10r=8r=14Initially, the first job for each task will be placed in the queue. Then, for each potential number of processors (p), the queue is processed and the waiting time is calculated. The wait time is then averaged and saved in the list “waitTimes” for each number of processors. The function will then return the number of processors that lead to the minimum waiting time, as well as the minimum waiting time.

Example Output:For this code, the output will depend on the number of processors used. Here is an example output if we use 1-4 processors:“With 1 processor, the average wait time was 8.74 seconds.”“With 2 processors, the average wait time was 3.12 seconds.

”“With 3 processors, the average wait time was 2.71 seconds.”“With 4 processors, the average wait time was 2.83 seconds.”So, based on the output, it is clear that 3 processors would lead to the most efficient processing of jobs. Therefore, we would need to use 3 processors to minimize the average waiting time.

To know more about simulates visit:

https://brainly.com/question/2166921

#SPJ11

IP address subnetting: \( 5^{\star} 2=10 \) points Suppose an ISP owns the block of addresses of the form \( 126.120 .40 .128 / 25 \). Suppose it wants to create four subnets from this block, with eac

Answers

An IP address is a numerical identifier assigned to each device connected to the internet, and is used to identify each device to the rest of the internet. IP subnetting refers to the process of dividing a large block of IP addresses into smaller subnets in order to efficiently allocate them to different devices or networks.

An ISP owns a block of addresses of the form 126.120.40.128/25 and wants to create four subnets from this block. The block has a prefix length of 25 bits, which means that the first 25 bits of the IP address are the network prefix, while the remaining 7 bits are the host portion.

To create four subnets from this block, we need to borrow 2 bits from the host portion of the address to use as subnet bits. This leaves us with 5 host bits, which gives us a total of 32 host addresses per subnet (2^5 = 32).

The new subnet mask will be /27 (25 + 2 = 27), which means that the first 27 bits of the IP address are the network prefix, while the remaining 5 bits are the host portion.

This gives us the following four subnets:

Subnet 1: 126.120.40.128/27 (network ID: 126.120.40.128, broadcast address: 126.120.40.159)

Subnet 2: 126.120.40.160/27 (network ID: 126.120.40.160, broadcast address: 126.120.40.191)

Subnet 3: 126.120.40.192/27 (network ID: 126.120.40.192, broadcast address: 126.120.40.223)

Subnet 4: 126.120.40.224/27 (network ID: 126.120.40.224, broadcast address: 126.120.40.255)

Each of these subnets has a maximum of 32 host addresses, and can be used to assign IP addresses to different devices or networks. By subnetting a large block of IP addresses in this way, an ISP can efficiently allocate addresses to different customers or networks without wasting any address space.

To know more about IP addresses visit:

https://brainly.com/question/32308310

#SPJ11

Write code in java
1. Print the matrix in the spiral format. User has to input the direction either it is clockwise or anticlockwise. clockwise print the array starting from 1,2,3,4,5,6,7,8,9,10,11,12,13,14,15,16. antic

Answers

Here is the Java code for printing a matrix in spiral format based on user input of clockwise or anticlockwise direction.

The matrix values are hardcoded in this example, but you can modify the code to take user input for the matrix as well:
import java.util.Scanner;

public class SpiralMatrix {
   public static void main(String[] args) {
       Scanner scanner = new Scanner(System.in);
       System.out.println("Enter direction (clockwise or anticlockwise): ");
       String direction = scanner.nextLine();
       int[][] matrix = {
           {1, 2, 3, 4},
           {5, 6, 7, 8},
           {9, 10, 11, 12},
           {13, 14, 15, 16}
       };
       spiral(matrix, direction);
   }
   
   public static void spiral(int[][] matrix, String direction) {
       int rows = matrix.length;
       int cols = matrix[0].length;
       int startRow = 0, startCol = 0, endRow = rows-1, endCol = cols-1;
       while (startRow <= endRow && startCol <= endCol) {
           if (direction.equalsIgnoreCase("clockwise")) {
               // Print top row
               for (int j = startCol; j <= endCol; j++) {
                   System.out.print(matrix[startRow][j] + " ");
               }
               startRow++;
               // Print right column
               for (int i = startRow; i <= endRow; i++) {
                   System.out.print(matrix[i][endCol] + " ");
               }
               endCol--;
               // Print bottom row
               for (int j = endCol; j >= startCol; j--) {
                   System.out.print(matrix[endRow][j] + " ");
               }
               endRow--;
               // Print left column
               for (int i = endRow; i >= startRow; i--) {
                   System.out.print(matrix[i][startCol] + " ");
               }
               startCol++;
           } else if (direction.equalsIgnoreCase("anticlockwise")) {
               // Print left column
               for (int i = startRow; i <= endRow; i++) {
                   System.out.print(matrix[i][startCol] + " ");
               }
               startCol++;
               // Print bottom row
               for (int j = startCol; j <= endCol; j++) {
                   System.out.print(matrix[endRow][j] + " ");
               }
               endRow--;
               // Print right column
               for (int i = endRow; i >= startRow; i--) {
                   System.out.print(matrix[i][endCol] + " ");
               }
               endCol--;
               // Print top row
               for (int j = endCol; j >= startCol; j--) {
                   System.out.print(matrix[startRow][j] + " ");
               }
               startRow++;
           }
       }
   }
}

This code first prompts the user to enter the direction (clockwise or anticlockwise). It then initializes a 4x4 matrix with hardcoded values.

To know more about anticlockwise visit:

https://brainly.com/question/30284968

#SPJ11

Explain whether internet packets travel in the Internet.What
does actually travel? Give examples.

Answers

It is the packets themselves that travel across the Internet, carrying the data and control information necessary for reliable and efficient communication between devices.

Internet packets do travel across the Internet. When data is transmitted over the Internet, it is divided into smaller units called packets. These packets contain both the data being transmitted and control information that helps in their routing and reassembly at the destination.

Each packet consists of a header and a payload. The header contains important information such as the source and destination IP addresses, sequence numbers, and checksums. The payload carries a portion of the actual data being transmitted.

When a device sends data over the Internet, it encapsulates the data into packets and sends them out onto the network. These packets travel across various routers and network links to reach their destination. At each intermediate router, the header information is examined to determine the next hop for the packet. The packets are then forwarded from router to router until they reach their intended destination.

At the destination, the packets are received and reassembled to reconstruct the original data. This reassembly is done based on the information in the packet headers, ensuring that the packets are put back in the correct order.

Example:

Let's say you are sending an email with an attachment to a friend. The email client on your device will break down the email and its attachment into smaller packets. These packets will then be routed through the Internet, hopping across multiple routers and network links. Each packet will carry information about the source, destination, and sequence number.

As the packets traverse the Internet, they may take different routes based on network conditions and routing protocols. They might travel through different cities, countries, and even continents. Eventually, the packets will reach the destination, where they will be reassembled by the recipient's email client. The recipient will then be able to view the complete email and download the attachment.

Learn more about packets here: https://brainly.com/question/32888318

#SPJ11

With java, tell a user to enter the integer number. Then do the
sum of all odd numbers between the number 1 and the given
number.

Answers

To calculate the sum of all odd numbers between 1 and a given integer, we can use Java programming language. First, we prompt the user to enter an integer number. Then, we iterate through all odd numbers from 1 up to the given number, calculating their sum. Finally, we display the result to the user.

In more detail, the program starts by displaying a message asking the user to enter an integer number. The user's input is then stored in a variable called "number." Next, we initialize a variable called "sum" to hold the running total of the odd numbers. Using a for loop, we iterate through each odd number between 1 and the given number. Inside the loop, we add the current odd number to the sum. After the loop finishes, the program outputs the sum of all the odd numbers between 1 and the given number.

Here's the code in Java:

import java.util.Scanner;

public class OddNumberSum {

   public static void main(String[] args) {

       Scanner input = new Scanner(System.in);

       

       System.out.print("Enter an integer number: ");

       int number = input.nextInt();

       

       int sum = 0;

       for (int i = 1; i <= number; i += 2) {

           sum += i;

       }

       

       System.out.println("The sum of all odd numbers between 1 and " + number + " is: " + sum);

       

       input.close();

   }

}

We explain that the user will be prompted to enter an integer, and the program will perform the necessary calculations to determine the sum. The result will then be displayed to the user.

We mention that the program utilizes a `Scanner` object to capture the user's input. We initialize variables to store the number entered by the user and the running sum of the odd numbers. A `for` loop is used to iterate through each odd number from 1 up to the given number, adding them to the sum. Finally, we output the sum of all the odd numbers between 1 and the given number.

learn more about Java programming language here: brainly.com/question/10937743

#SPJ11

#include
#include
using namespace std;
int main()
{
int scores;
int marks_range[8];
ifstream inFile;
inFile.open("Ch8_Ex4Data.txt");
for(int a=0; a<8; a++)
{
marks_

Answers

The missing term in the given code is "marks_range[a]".Let's understand the given code.#include  : This is a preprocessor directive that includes a file into the source code.

It is used to include header files, which are generally used for the declaration of functions and variables.#include  : This is another preprocessor directive that includes a file into the source code. This is used for handling input/output operations.using namespace std : This is a directive that is used to avoid having to write the std namespace repeatedly.int main() : This is the starting point of the program and is a function of the int return type.int scores; : A variable of type int is declared with the name scores.int marks_range[8]; : An array of type int is declared with the name marks_range that has 8 elements.ifstream inFile.

To know morde about understand visit:

https://brainly.com/question/24388166

#SPJ11

3.3 Task Three: Programming Challenges (P676) (20 marks) . 8. Days in Current Month Write a program that can determine the number of days in a month for a specified month and year. The program should allow a user to enter two integers representing a month and a year, and it should determine how many days are in the specified month. The integers 1 through 12 will be used to identify the months of January through December. The user indicates the end of input by entering 0 0 for the month and year. At that point, the pro- gram prints the number of days in the current month and terminates. Use the following criteria to identify leap years: 1. A year Y is divisible by 100. Then Y is a leap year if and if only it is divisible by 400.- For example, 2000 is a leap year but 2100 is not. 2. A year Yis not divisible by 100. Then Y is a leap year if and if only it is divisible by 4. For example, 2008 is a leap year but 2009 is not. Requirements: (1) Date(Any name) class should be declared. (2) bool isLeap() should be included in this class. (3) void printDays() should be included in this class. (4) An array of daysInMonth should be defined. (5) http://www.cplusplus.com/reference/ctime/tm/ struct tm Time structure Structure containing a calendar date and time broken down into its components. The structure contains nine members of type int in any order), which are: tm_sec tm mon C90 (C++98) 099 (C++11) Member Type Meaning Range int seconds after the minute 0-61* tm min int minutes after the hour 0-59 tm_hour ſint hours since midnight 10-23 tm mday int day of the month 1-31 int months since January 10-11 tm_year lint years since 1900 tm wday lint days since Sunday 10-6 tm yday lint days since January 1 0-365 tm isdstint Daylight Saving Time flag The Daylight Saving Time flag (tm_isdst) is greater than zero if Daylight Saving Time is in effect, zero if Daylight Saving Time is not in effect, and less than zero if the information is not available. tm_sec is generally 0-59. The extra range is to accommodate for leap seconds in certain systems. See also mktime localtime gmtime Convert tm structure to time_t (function ) Convert time_t to tm as local time (function ) Convert time_t to tm as UTC time (function ) (6) Run the program and capture screenshots of output. Here is the sample: Enter month and year: 2 2008 The enther month, February 2008, has 29 days The current month, April 2019, has 31 days

Answers

The purpose of the programming task is to create a program that determines the number of days in a specified month and year, considering leap years, and displays the result to the user.

What is the purpose of the given programming task?

The given task requires the implementation of a program that can determine the number of days in a specified month and year. The program should prompt the user to enter a month and year as integers, and based on the input, calculate and display the number of days in that particular month.

The program should use the provided criteria for identifying leap years to determine if February should have 28 or 29 days.

To accomplish this task, the following requirements need to be fulfilled:

Declare a class named "Date" to handle the functionality.Include a boolean method named "isLeap()" within the Date class to determine if a given year is a leap year or not.Include a void method named "printDays()" within the Date class to calculate and display the number of days in the specified month.Define an array named "daysInMonth" to store the number of days in each month.Utilize the "struct tm" from the "ctime" library to handle the calendar date and time components.Implement the program, allowing the user to input the month and year, and capture screenshots of the output.

Overall, the goal is to create a program that accurately calculates the number of days in a specified month and year, taking into consideration leap years and providing the desired output format.

Learn more about programming task

brainly.com/question/32578672

#SPJ11

Using C++
Given the following class definition S
const unsigned HT_SIZE = 10; // Hash Table Size
struct Symbol{ string name; Symbol * next; };
class Table { // Symbol Table class
public:
Table(); // Initialize the hash table with NULL pointers
Symbol* clear(); // Clear symbol table
Symbol* lookup(string); // Lookup name s
Symbol* lookup(string,unsigned h);// Lookup s with hash h
void insert(string s); // Insert s with its hash value in the table
Symbol* lookupInsert(string); // Lookup and insert s
unsigned hash2(string s);
void travers();
private: Symbol* ht[HT_SIZE]; // Hash table
Symbol* first; // First inserted symbol
Symbol* last; // Last inserted symbol };
a. Write the function insert that insets a symbol in a hash table where the hash table size is given by the constant HT_SIZE in the above definition [10 marks]
b. Write an application to test the class implementation that: i. reads N symbols from the input, ii. store them in the hash table, iii. search for M symbols and return the symbol name if found and a zero if it was not found, iv. traverse the table to display all symbols stored

Answers

a. The insert function is responsible for inserting a symbol into the hash table based on the provided hash table size (HT_SIZE). It uses the hash value of the symbol to determine its position in the table and handles collision resolution if necessary.

b. An application can be written to test the class implementation. It reads N symbols from the input, stores them in the hash table, searches for M symbols, returns the symbol name if found, and zero if not found. Finally, it traverses the table to display all stored symbols.

a. To implement the insert function, you can use the provided hash table size (HT_SIZE) and the hash value of the symbol. The function calculates the hash index based on the hash value and uses it to insert the symbol into the hash table. If there are collisions, appropriate collision resolution techniques can be employed, such as chaining with linked lists or open addressing.

b. To test the class implementation, an application can be developed. It reads N symbols from the input and uses the insert function to store them in the hash table. It then performs M symbol searches using the lookup function and displays the symbol name if found. Finally, it uses the travers function to iterate over the hash table and display all stored symbols.

To know more about collision resolution here: brainly.com/question/12950568

#SPJ11

Write code that outputs variable numExams. End with a newline. Not all tests passed. X 1: Compare output ヘ Output differs. See highlights below. Input Your output Expected output X 2: Compare output

Answers

To write code that outputs variable num Exams, we can simply assign a value to the variable and then use the print statement to output its value. Here's an example of Python code that does that:```

n the above code, we assign the value 5 to the variable num Exams using the assignment operator (=). We then use the print statement to output its value to the console. The end="\n" argument tells Python to end the output with a newline character, which ensures that the output appears on a new line.

The above code will output the value of the numExams variable (in this case, 5) followed by a newline character. If we want to output a message along with the variable value, we can B the message and the variable using the + operator:

num Exams = 5print("The number of exams taken is:", num Exams, end="\n")


This code will output the message "The number of exams taken is:" followed by the value of the num Exams variable, separated by a space, and then a newline character at the end. The output will look like this: The number of exams taken is: 5

To know more about outputs visit:

https://brainly.com/question/32675459

#SPJ11

[QUESTION 10 POSSIBLE MARKS]: final answer please
A) considering a Hard Disk Drive (H.D.D) with the following characteristics:
Block size = 96 bytes ,Number of blocks per track = 79 blocks , Number of tracks per surface = 8 tracks , H.D.D consists of 63 double-sided plates/disks. What is the total capacity of a cylinder?
------

Answers

The total capacity of the cylinder in this HDD would be:

Total capacity of the HDD = 60,672 bytes/cylinder x 1008 cylinders = 61,232,736 bytes or approximately 58.4 MB (using 1MB=1,000,000 bytes).

The total capacity of a cylinder in a Hard Disk Drive (HDD) can be calculated as follows:

Calculate the number of blocks per cylinder: Number of blocks per cylinder = Number of tracks per surface x Number of blocks per track

Number of blocks per cylinder = 8 tracks x 79 blocks/track = 632 blocks/cylinder

Calculate the size of a cylinder in bytes: Size of a cylinder = Number of blocks per cylinder x Block size

Size of a cylinder = 632 blocks/cylinder x 96 bytes/block = 60,672 bytes/cylinder

Calculate the total capacity of the HDD by multiplying the size of a cylinder by the number of cylinders in the entire HDD. Total capacity of the HDD = Size of a cylinder x Number of cylinders in the HDD

The number of cylinders in the entire HDD is equal to the number of tracks per surface multiplied by the number of surfaces per plate multiplied by the number of plates:

Number of cylinders in the HDD = Number of tracks per surface x Number of surfaces per plate x Number of plates

Number of cylinders in the HDD = 8 tracks/surface x 2 surfaces/plate x 63 plates = 1008 cylinders

Therefore, the total capacity of the cylinder in this HDD would be:

Total capacity of the HDD = 60,672 bytes/cylinder x 1008 cylinders = 61,232,736 bytes or approximately 58.4 MB (using 1MB=1,000,000 bytes).

Learn more about  HDD from

https://brainly.com/question/29608399

#SPJ11

note : my subject is Essentials Error- Control Coding
Willy
A- Find the code word error probability of a repetition code \( (5,1) \), if it is transmitted over binary symmetrical channel with error probability \( =\left(10^{-4}\right) \)

Answers

A repetition code is a coding technique that involves repeating the bits to be transmitted multiple times, with the hope of being able to correct some errors that may occur during transmission.

A repetition code [tex]\( (n,1) \)[/tex]repeats the information bit n times, resulting in a longer code word with n bits.For the repetition code [tex]\( (5,1) \),[/tex] the error correction capability is limited to one error in the transmitted codeword. So, if more than one bit in the transmitted codeword is in error, it will be detected but not corrected.

The probability of a correct bit is[tex]\(P_c = 1-p\),[/tex]

and the probability of an error bit is[tex]\(P_e = p\).[/tex]

The probability of getting three correct and two error bits in a codeword is:

[tex][P\left(3\ correct\ bits\ and\ 2\ error\ bits\right) = \left(\begin{matrix}5\\ 3\end{matrix}\right){P_c}^3 {P_e}^2\][/tex]

The probability of getting four correct and one error bit in a codeword is:

[tex][P\left(4\ correct\ bits\ and\ 1\ error\ bit\right) = \left(\begin{matrix}5\\ 4\end{matrix}\right){P_c}^4 {P_e}^1\]The probability of getting five correct bits and no error bits in a codeword is:\[P\left(5\ correct\ bits\ and\ 0\ error\ bits\right) = {P_c}^5\][/tex]

Then the probability of decoding error can be obtained as the sum of the probabilities of receiving 0, 1, or 2 correct bits, which is equal to:[tex]\[P_{\text{error}} = P\left(0\ correct\ bit\right) + P\left(1\ correct\ bit\right) + P\left(2\ correct\ bits\right)\][/tex]Substituting the calculated probabilities into the above formula yields:

To know more about transmission visit:

https://brainly.com/question/28803410

#SPJ11

The following set of strings must be stored in a trie: mow, money, bow, bowman, mystery, big, bigger How many internal nodes are there on the path to the word "mystery"? Selected Answer: 1

Answers

Binary search is an algorithm that efficiently searches for a target value in a sorted array by repeatedly dividing the search range in half.

How does the binary search algorithm work?

The binary search algorithm works by repeatedly dividing a sorted array in half and comparing the middle element with the target value.

If the middle element is equal to the target value, the search is successful. If the middle element is greater than the target value, the search continues in the left half of the array.

If the middle element is less than the target value, the search continues in the right half of the array. This process is repeated until the target value is found or the search range is empty.

Learn more about algorithm

brainly.com/question/33344655

#SPJ11

Discuss the impact of systems knowledge related to mail
operations on a company.

Answers

The impact of systems knowledge related to mail operations on a company is significant. Understanding how to effectively manage and streamline mail operations can lead to improved efficiency, cost savings, and customer satisfaction.

Efficient processing: A company with systems knowledge can implement automated processes for sorting and routing mail. This reduces the time and effort required to handle and deliver mail, resulting in faster and more reliable service Cost savings: By optimizing mail operations, companies can reduce costs associated with manual sorting, transportation, and labor.


Enhanced customer service: With systems knowledge, a company can implement tracking systems that allow customers to easily monitor the status of their mail. This provides transparency and improves customer satisfaction.
Data analysis: Systems knowledge enables companies to analyze mail data, such as delivery times and customer preferences. This information can be used to identify trends, make data-driven decisions, and improve overall mail service.
To know more about streamline visit:

https://brainly.com/question/30019068

#SPJ11

1. How is turning the battery pack switch off different from
turning it on ?

Answers

When you switch off the battery pack, you are essentially removing the flow of electric current from the system, which results in the termination of any activities that were being powered by it. Turning it on, on the other hand, allows electric current to flow through the system, which then results in it being able to power the activities that require the electrical power.

The purpose of the battery pack is to store energy that can then be used to power a wide variety of electronic devices. This energy storage unit, which is used to power a variety of electronic devices, is made up of numerous battery cells that are linked together. It works in a manner that is similar to a gas tank, in that it must be refueled after the stored power has been depleted. In this case, the battery pack must be charged after it has been depleted of its stored energy.

Therefore, when the battery pack switch is turned off, the flow of electric current through the system is disrupted, whereas when it is turned on, electric current flows through the system, allowing it to operate and supply power to any device that is connected to it.

To know more about switch off the battery pack visit:

https://brainly.com/question/30704583

#SPJ11

Other Questions
system requires coincidence of wants between the buyer and the seller QUESTION 2 A machinist turns the power on to a grinding wheel, at rest, at time t = 0 s. The wheel accelerates uniformly for 10 s and reaches the operating angular velocity of 42 rad/s. The wheel is run at that angular velocity for 32 s and then power is shut off. The wheel slows down uniformly at 2.2 rad's until the wheel stops. In this situation, the total number of revolutions made by the wheel is closest to: o 210 250 310 280 410 QUESTION 2 A 0.24 kg blob of clay is thrown at a wall with an initial velocity of 20 m/s. If the clay comes to a stop in 91 ms, what is the average force experienced by the clay? 45 N 33 N 53 N 64 N QUESTION 1 At time t = 0 s, a wheel has an angular displacement of zero radians and an angular velocity of +26 rad/s. The wheel has a constant acceleration of 0.43 rad's2 In this situation, the time t (after t=0 s), at which the kinetic energy of the wheel is twice the initial value, is closest to: O 150 s O 60 s 130 s O 85 s O 110 s Vamos a traer la tarea a la profesora. Vamos a traer__________ Group of answer choicesnoslalalalelasela Name at least 2 reasons why the suburbs were a place that veterans went to live after World War II.Brainlist for first answer!! #1. The Intertropical Convergence Zone (ITCZ) is known for very high amounts of rainfall each year. This is the area in which this type of geographical land feature is found where you would expect a lot of rain. #2. Which of the following types of air masses would you expect to develop over Siberia during the middle of winter? Continental Polar Continental Arctic Maritime Tropical Maritime Polar Maritime Arctic Continental Tropical ne Source Company produces a single product, which it sells for $8.00 per unit. Variable costs per unit equal $3.20. The company expects short-term fixed costs to be $7,200 for the coming month, at the projected sales level of 20,000 units. Management is considering several alternative actions designed to improve operating results. In conjunction with this, they have created a profit-planning (that is, a CVP) model, which can be used to evaluate different scenarios.One Source Companys management believes that a 10% reduction in the selling price will increase sales volume by 10%. If this plan is implemented, then operating profit should:Multiple ChoiceIncrease by approximately $8,000 per month.Remain approximately the same.Decrease by approximately $8,000 per month.Decrease by approximately $16,000 per month.Increase by approximately $16,000 per month. Based on your visual survey, the patient appears to be unresponsive. What should your immediate next action be?a. Establish cardiac monitoring.B. Check for responsiveness using the shout-tap-shout sequence.c. Assess airway patency.d. Begin CPR. A 3-year-old child has been observed in the clinic waiting room taking toys from others, tearing pages out of books, and striking the mother. The nurse takes time when interviewing the mother to ask about television habits because of which reason?1 Viewing violent programs is positively correlated with the development of aggression.2 The nurse is interested in how much time the mother spends during interactions with the child.3 Watching Sesame Street and other children's shows results in slow cognitive development.4 There is a direct correlation between the number of hours of television viewed and toddler aggression. 2. Jeremy is thinking of starting up a candle manufacturing business. The initial outlay for equipment, moulds, and other required production equipment is $15,000. Working part time on this hobby business, Jeremy estimates that he will lose $2,000 in the first year, break even in the second year, and earn annual profits of $5,000, $10,000, and $15,000 in subsequent years. After the five years, he hopes to sell the business to an investor for $17,500. If his cost of capital is 8.25% compounded annually, should he pursue this venture? Provide net present value calculations to support your answerI need an answer by using You MUST use the TI BA II calculator features (N, I/Y, PV, PMT, FV, AMORT) to solve questions whenever possible. A threaded pipe expansion joint compensates for all ofthe following except ______.A. external forcesB. effects of pressureC. relief valve operationD. effects of temperature Chamberlain Company wants to issue new 14-year bonds for some much-needed expansion projects. The company currently has 9.0 percent coupon bonds on the market that sell for $1,048.86, make semiannual payments, and mature in 14 years. What coupon rate should the company set on its new bonds if it wants them to sell at par? Assume a par value of $1,000. Multiple Choice 8.10% 8.30% 8.40% 4.20% 8.70% After a recent departmental reorganization, the nurse manager observes tension in several interactions among the staff. The manager understands that which of the following common causes for conflict in organizations could be at the root of the tension? (Select all that apply.)a. Individual behaviorb. Unclear expectationsc. Clear communicationd. Staffing changese. Diversity using a block diagram, discuss the operation of an fmdigital broadcasting receiver L1 = L2 = L3= 1*10^-3 mmW1 = W2 = 10^-3 mmW3 = ?For all the mosfets ->Vt = 1Vkn' = 200um/V^2a)Assume that the transistor Q1 will be biased with a constantcurrent of 2mA thanks to the curre Bonds Payable were issued to purchase a Building. This transaction would be reported in the statement of cash flows in: 1) the cash flows from operating activities section. 2) a separate schedule as a noncash investing and financing activity. 3) the cash flows from investing activities section. 4) the cash flows from financing activities section. PYTHONGiven this BST, list the contents of the tree in: - Blank 1: preorder - Blank 2: postorder - Blank 3: inorder - Blank 4: levelorder Put a single space between each number. Do NOT use comma. A A A A A company's net sales are $852.820, its costs of goods sold are $461,375, and its net income is $119,495. Its gross margin ratio equals: Multiple Choice S41% 465 9%. 25, 99%. 14,01% The following readings were taken during a test on a single-cylinder, four-stroke cycle oil engine: Cylinder bore, 20 cm; Stroke length, 35 cm; Indicated mean effective pressure, 700 kPa; Engine speed, 4 r.p.s; Fuel oil used per hour, 3-5 kg; Calorific value of oil, 46,000 kJ/kg; Brake torque, 450 N.m; Mass of jacket cooling water per minute, 5 kg; Rise in temperature of jacket cooling water, 40C; Mass of air supplied per minute, 1.35 kg; Temperature of exhaust gases, 340C; Room temperature, 15C; specific heat capacity of exhaust gases, 1 kJ/kg K;Calculate3.1 The mechanical efficiency3.2 The indicated thermal efficiency3.3 The brake power fuel consumption in kg per kW-hr. Also,3.4 The Also draw up a heat balance sheet in kJ/min. and as percentages of the heat supplied to the engine 3. What size holes in angle e? A. 13/16 inch B. \( 15 / 16 \) inch C. 2 inch\( 4.9 \) If you are going to drill and tape a \( 1 / 2 \) " bolt hole to bolt a machine part to heavy cast iron housing, canyou please code this in java!!Wrte a program that prompts the user (at the keyboard) for a value and searches the fle nunbers. text for that value, printing out the iast position where the number appears in the fle (the first numb